BQE CORE Review: Pros and Cons, Features
If you’re running a project-based company and want to boost profitability, BQE CORE is a strong option. It’s ideal for small to midsize businesses that want to keep a close eye on billing and time tracking to see how their employees are performing.
However, if you’re a big enterprise-level firm, BQE CORE might not be your best bet. It’s made for smaller and mid-level companies, so while it can still be helpful for larger firms, especially with some cool extra features, the pricing per user might not be the most budget-friendly if you already have over 100 employees.
- Billing, time and expenses tracking by project phase
- Employees can input time entry from anywhere
- Great for project management
- Lets project managers send weekly cost reports
- Modular pricing
- Can't save edited standard reports for future use
- Forecasting reports
- Separate invoice per phase to QBO
- Per user pricing for some modules can make costs add up
- Larger midsize firms may outgrow the software
- Developer BQE Software Inc
- Client OS Windows, macOS, iOS, Android, Web
- Deployment Cloud Hosted
What is BQE CORE?
BQE CORE is a flexible business management solution with a full range of time and expense tracking, billing, project management, and accounting capabilities. This software is designed for use by:
- Consulting firms
- Architecture
- Engineering
- Professional services
Target Market
Designed specifically by industry experts for professional services firms, BQE CORE automates repetitive tasks, allows for streamlined collaboration, centralizes information, and offers incredible insights. It consequently helps you prevent billable time from slipping through the cracks, greatly increase productivity, and better plan for the future.
BQE CORE is cloud-based, so you can access it from anywhere, and you never need to worry about updates. Its à la carte pricing model means that you don’t need to pay for features you won’t use, and monthly, quarterly, and annual plans make it cost-effective for firms with seasonal employees or shifting demand.
Our Ratings
Usability - 10 | Has a modern and very visual user interface; navigating between different tasks is highly intuitive. |
Support - 9 | Support is available by phone or email; BQE University offers webinars, e-books, and learning guides for improving performance; live and on-demand customer training available; average wait time is 90 seconds. |
Features - 8 | Simple but effective work order feature; upload photos and assign procedures (tasks) to employees; the mobile app offers the same features as the browser option; less expensive plans lack a request feature. |
Security - 10 | Fully cloud-based system is accessible from any internet browser and through mobile apps; open API allows for customizable integrations. |
Value - 8 | Offers per-user pricing, which can add up for larger companies; optional modules that cover additional accounting, CRM, and HR functionality are charged per year. |
Performance - 9 | Functionality was fast and responsive; no slowness or performance issues; changes made in the app were reflected on the browser version in real-time. |
Scalability - 8 | Pricing is based on the total number of users, so growth can get expensive for smaller companies during growth periods; optional modules can increase functionality to meet new business needs. |
Features
During this evaluation of BQE CORE, these features stood out:
Real-time Updates on KPIs
BQE CORE is designed to provide actionable insights at a glance, so all KPI updates happen in real-time. In general, the dashboard offers the first clear overview of projects based on:
- Budget
- Profitability
- Status
Project managers can view performance based on the client, employee, or project level. Each user’s view is customizable due to user conditions. Users can filter out projects to focus on a specific project or client.
Gantt Chart
One unique feature offered by BQE CORE is the ability to organize projects using Gantt charts. While there are traditional list views of projects available, this is one way to increase visibility into a project’s timeline and required tasks. This feature is a great way for project managers to see if there might be any scheduling conflicts or opportunities for taking on new work.
Changes are easy to make thanks to drag-and-drop functionality. BQE CORE also offers some protection to anyone editing a project as a Gantt chart. For example, if an adjustment causes a scheduling conflict, the system will automatically recognize the potential issue and will ask users to confirm they want to make the changes. Those changes are then reflected in the list views as well.
Batch Invoices
This is another standout feature. Batch invoicing allows you to send multiple invoices at the same time, saving valuable time. Invoices can be filtered in several different ways, such as selecting the client or project manager at a given time. Thanks to this feature, project managers can make invoice adjustments all in one place.
Additionally, BQE CORE shows if items are pending to be billed so project managers know instantly what needs to be reviewed before a batch goes out.
What Features Are Missing?
Some extra features which would make using BQE CORE even better include:
- Added Payroll: The accounting module offered by BQE CORE covers a lot, but it’s currently missing payroll functionality. Businesses which were hoping for an all-in-one solution will need a separate solution for payroll.
- Additional integrations: BQE CORE does have integrations with accounting programs like QuickBooks, Xero, and AccountRight, but you’ll have to check with BQE CORE to see if it’s possible to integrate any other solutions. Of course, users could simply add-on the official accounting module instead to keep all their accounting functionality in the same platform.
Pricing Plans
Plan | Pricing | Features |
Foundations | Priced per user | Includes:
|
Accounting Module | Charged per year | Includes everything in Foundation plus:
|
CRM Module | Charged per year | Includes everything in Foundation plus:
|
HR Module | Priced per user | Includes everything in Foundation plus:
|
Total costs are based on the number of users and whether any modules are included. The three modules are entirely optional. Customers can opt for only the ones they need if they need any at all.
Training courses, both live and on-demand, are free for BQE CORE customers. One-on-one onboarding can be purchased on an as-needed basis.
Since pricing is user-based, you’ll need to contact BQE CORE to request a free quote in order to get accurate pricing information. Free demos are available.
FAQ
Here are some frequently asked questions about BQE CORE software:
What does BQE CORE do?
BQE CORE software automates repetitive tasks related to project management, time and expense tracking, and general accounting. Optional modules add HR, CRM, and accounting functionality.
How do I contact BQE CORE support?
BQE CORE has several support methods available. Email and phone support are both available 24/7, 365 days a year. Email support is the same for all users. There are international support phone lines for:
- Australia
- Canada
- Hong Kong
- India
- Ireland
- Malaysia
- Mexico
- Netherlands
- New Zealand
- Singapore
- UAE
- United Kingdom
Alternatives
Summary
Based on our experience, we recommend BQE CORE to businesses wanting to increase project simplicity while improving project profitability. This comprehensive solution is aimed at firms in the architectural and engineering sectors, although it is also popular with consultants and legal professionals. Any small to mid-size firm can benefit from this software to improve project management practices.
BQE CORE might not work for non-firm businesses, although this software can fit all types of companies. It is not designed for large-scale enterprises, so mid-level companies that are on the threshold of 100 or more employees might want to consider another solution. However, it is an ideal alternative for firms that are using complicated project management systems and want to simplify.
User Reviews of BQE CORE
Write a Review![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Coming from BQ, CORE is amazing!
We are benefiting from Scheduled reports, epayments, batch updates, batch everything!, ease of workflows and the tap to talk app for exceptional support. Coming from BQ, CORE is amazing!
Pros
It's a steady process but all aspects are saving our company time and money. AR is easy to see and clients have fewer questions about projects.
Cons
Statements can get glitchy but CORE is working on that.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Invoicing process is a huge improvement from AA
We have been using it primarily for billing and it has streamlined and improved the process immensely. Work in Hand report makes it much easier for Principals to review all their projects at once, not miss any billing, know exactly where projects stand.
Pros
Invoicing process is a huge improvement from AA, creating/editing drafts, the ability to change invoice date & number, emailing directly through Core has saved me a huge amount of time.
Cons
There should be a feature to have Digital signatures on timesheets. Report specifically by client showing their average days to pay.
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
The automation with the cloud feed is great for accounting
All of it - we came from a paper, Excel, Filemaker Pro, Timeslips, Quickbooks mess. The automation with the cloud feed is great for accounting. The ePayment option is something I just set up for our company and am looking forward to having clients take advantage of, the project management module helps us track our time and expenses in the project in ways that we could not before. For the first time in our 45 year company history we have a company budget for this year. While I am still learning and looking at how our company can best utilize CORE in all areas, we are definitely benefitting from using it. It has made tracking unpaid invoices much easier, thus making it easier to follow up with clients who we need to receive payment from. We now have a payables system to use, instead of a paper file. I could go on…
Pros
I just love it. Your support, training, sales people are all really helpful.
Cons
or a small business, where many approval steps aren't really as necessary, some of these steps become a bit cumbersome. That being said, it does force me to look at the data people are entering and perhaps correct it before things get out of hand too far down the line.
![](/images/avatar.png)
- Construction & Engineering
- 51-250 employees
- Annual revenue $10M-$50M
Ability to update the Core database remotely
In my capacity as an Accounts Manager, I feel liberated to access critical client data in real time. Ability to update the Core database remotely from multiple devices has increased efficiency and productivity for the Finance & Accounting Dept.
Pros
Seamless integration across one interface has been a game changer for project management. Collaboration, time and expense entries and accessing overall health of projects is readily available. Key performance indicators and customizable dashboards offers the foodies who eat with their eyes an appetizing experience using Core.
Cons
Select a Core group of users, incentivize and march to the finish line fielding their hands on user experience , constraints and limitations. Polishing and adding new features are the key to user satisfaction.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
The invoicing and payment process in Core is quick and easy
With Core the management team has become efficient when using the AR Aging report with retainage by easily showing what is outstanding including the retainage portion is important for them to understand
Pros
The invoicing and payment process in Core is quick and easy. Our client billing involves retainers and this feature is very helpful in Core and has eliminated the need for manual tracking in Excel.
Cons
Having Retainer and Retainage on the same report can cause confusion here up North! LOL! We don't use the work retainage, we just call it holdback. Also, some reports could have a little more info on it, such as descriptions and subtotals.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
The best our staff likes about Core is the detail oriented mobile phone app
Prior to switching to Core we were using BillQuick for 17 years and about time to switch to a cloud based software with a beautiful look and feel. Overall experience is great.
Pros
The best our staff likes about Core is the detail oriented mobile phone app. It is very easy to work in the app and keeps our staff connected. All the documents related to our projects are in one place which makes it easy to track
Cons
The global search needs to be extended to user defined custom fields.
![](/images/avatar.png)
- Construction & Engineering
- 51-250 employees
- Annual revenue $10M-$50M
With Core mobile phone our staff find it easy to capture expense receipts
While we were looking for a software it was important for us to make sure whichever software we switch to should be user friendly. With Core, it was easy for our staff to learn how to use Core because of its intuitiveness. Most of our staff is in the field and expense tracking was kind of a pain. With Core mobile phone our staff find it easy to capture expense receipts which makes job costing and reporting easier.
Pros
User friendliness, easy time and expenses tracking using phone apps, particularly for our field staff.
Cons
Some areas of report filters need improvement
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Our firm enjoys time and billing and reporting features of Core
Our firm enjoys time and billing and reporting features of Core
Pros
The best about Core that we right away started benefiting from is how it has eliminated the need for excel to keep track of retainer and retainage balance on projects. This has resulted in extremely efficient financial meetings with the CEO and the principals of the firm. Also, Time tracking is easy and pretty straightforward
Cons
A little bit of confusion with the terminology of holdback and the retainage. Occasional lag in response after I hit the enter key.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Our overall experience with Core is great
Our overall experience with Core is great. We have been a BQE customer for many years. Before Core we were using BillQuick for 17 years and we decided to upgrade to Core because it is more user friendly, modern and has dashboards that give us real-time picture of our business. The reporting is powerful too and our staff finds mobile app very useful.
Pros
Mobile phone apps, reporting and the easy way for us to track proposals and project purchase orders.
Cons
So far liking everything and BQE is continuously making improvements to Core. We have made them aware of making improvements in the global search area.
![](/images/avatar.png)
- Construction & Engineering
- 1-10 employees
- Annual revenue $0-$1M
Core is easy to use
Core is easy to use
Pros
BQE Core has helped us overcome the challenge of fixed milestone billing and time tracking which our staff finds very easy to use time cards. The customer service is great and we do take advantage of free monthly webinars, a great resource for us to learn Core and company behind it.
Cons
The due date on the invoice should be at top in bold. Currently, it is listed at the bottom of the invoice and in our opinion it is difficult to read.
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Its easy project setup is allowing us schedule billing
We are active BQE Core users for almost 2 years now. Its easy project setup is allowing us schedule billing, tracking time spent on projects for accurate job cost analysis. BQE customer service team has exceeded our expectations as we continue to receive outstanding customer service
Pros
Billing, time and expenses tracking by project phase and accounts payable.
Cons
We would like to see some improvements in the area of forecasting reports.
![](/images/avatar.png)
- Professional Services
The main thing Core has done is save countless hours
Core allowed us to streamline our invoicing process from start to finish processing time of a day or two in our old system to a handful of hours. Custom reporting tailored to our company’s processes also allows us deeper insight to tracking time against a project and gives us accurate data to easily keep our clients informed about the financial detail and progress of their projects (while simultaneously monitoring employee realization rates and productivity). Technical support is top notch, the phone is answered quickly and the people on the other end of the line are excellent at solving issues or questions that pop up.
Pros
Overall our experience is quite positive. Our company uses the time management and billing features and staff was quick to adapt. The main thing Core has done is save countless hours in the billing process as well as the ability to generate useful reporting that is helpful to staff at the ownership and management levels
Cons
Core sends out one separate invoice per phase to QBO rather than one invoice that includes all phases.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
The reporting is Core is far superior
Overall experience has been good. Tech support people very knowledgeable, professional and patient. Some bumps in the road in the very beginning but well past that now. The reporting is Core is far superior than what we had in our previous software.
Pros
Reporting and easy time and expense tracking
Cons
We use Core in a limited fashion. We are reluctant to integrate QuickBooks with Core because that then links our banking info to Core as well. So for what we use, I can't really think of any improvements.
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Core is so much better because we can enter time
We have been with BQE for almost 17 years now. We started out with BillQuick and then in 2018 we switched to Core. Core is so much better because we can enter time, do reports and do everything we need to do from any place that we are, on any mobile phone, laptop, iPad or computer. We especially like how we can set up scheduled reports that will be emailed directly to our managers as often as they want them and we do not have to remember to send the reports ourselves which saves a lot of time. Core is the way to go.
Pros
Love that the employees can input their time entry no matter where they are.
Cons
t hasnt happened recently but about a year ago every time you all did upgrades to Core it would mess up our custom reports or invoices and that was quite frustrating. You all must have resolved that because it hasnt happened recently.
![](/images/avatar.png)
Customer support is always great
It easy to track time, process invoices and track customer payments in BQE. I do not have to worry about in terms of developing or maintaining the software as it is all done by BQE. Customer support is always great.
Pros
My overall experience has been excellent. I am a single person business but do have contracts and contractors at times. I feel BQE provides me with reliable, yet flexible, support to do what I need to do to be successful.
Cons
It is true no software is perfect. At this point BQE delivers what our needs are.
![](/images/avatar.png)
The good: Time and expense tracking and billing
We have been using BQE software for many years to track our time for payroll and billing our clients for the projects we do for our clients. Our clients need detailed invoices and BQE allows us to provide the details for reference in client billing
Pros
Time and expense tracking and billing.
Cons
It would be nice to make changes to standard reports and save as customized reports
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Core has really reduced the workload
My experience has been incredibly positive. Every step from the evaluation phase through our renewal for three years. Everyone that I have engaged has been very knowledgeable and are clearly well educated in the use of the software. The account management team has consistently informed us of new developments and tools. So that we can evaluate them for implementation into our suite of licenses. The partnership with sales team has been a large part of the reason that we committed to a 3 year renewal. Core has really reduced the workload to create projects and project information and allowed me, as the Operations Manager, to focus more on helping to run the business and mentor our project manager.
Pros
BQE Core has allowed us to put time and expense tracking, project management, and billing all in one application. We no longer have to use three applications to perform those functions. Because we use Core, our Project Managers have clear and concise access to project information through the dashboards and reports. The ability to memorize and schedule reports allows PMs to be sent weekly cost reports so that they are more aware of the charges on their projects without even having to open Core. Because of the ability to download data from reports and screens, we have been able to create project status sheets which put a variety of information that is pertinent to a project in one place. Template projects have been set up and now we can have a new project setup, including activity items, rules, and fee schedules within minimal time.
Cons
The workflow for dealing with vendor bills and other project expended that are directly charged to projects is not clear. It appears to be a two step approval process.
![](/images/avatar.png)
- Insurance
- 251-1K employees
- Annual revenue $50M-$100M
The price is right for the functionality you receive
Overall we are very satisfied with BQE. The price is right for the functionality you receive. We use BQE Core for time and expense entry and Invoicing only. It is a useful tool to track time, run reports, and generate invoices
Pros
Rather than having to keep track of time and expense in excel, we use BQE and it saves time, keeps records, and allows for reports
Cons
We need to ability to download invoices in PDF on our hard drive directly
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
It's how we bill our clients and pay our professionals
It’s how we bill our clients and pay our professionals. Now we’ve learned additional functionality for performance and reporting. Plus we’re looking forward to seeing how the CRM may add value with a single tool on our phones and PCs. Love the ability to charge out our jobs. Ease of use of the application. CORE is user friendly and for when working on the fly. Tech support is fabulous, friendly, and they know their product. Also, CORE is user friendly for back end administration. Reporting is very versatile, and I can pull up what I need quickly.
Pros
I had been in legal for years. Although I've always had a hand in software selection, IT dept handled the application, etc. I was able to set up the back end for our firm, which started in July. My users have learned the software quickly including those that have not previously billed their time. Short training. Simply - user friendly which is how I always select an application for a specific unit.
Cons
Can't think of any off the top of my head.
![](/images/avatar.png)
Inputting our time and expenses in is so much faster
The best feature is obtaining all the data that is inputted into the software and providing the reports that is required for time and/or expenses on each Project. Inputting our time and expenses in is so much faster - one does not have to do it manually and then trying to established what the billing and or expenses are for each client… as we have many projects on the go. Manually would be time-consuming vs. inputting into BQE.
Pros
Time and expenses, billing and reports
Cons
we have been pleased.. as long as the person inputting the information is correct. The only issue is - if the internet is down - we do not have access.
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
It has the essential features we need to manage project time and budgets
It has the essential features we need to manage project time and budgets. In general, it is a solid and reliable product. We have not had any significant problems over the course of using it. Support is very timely and accurate. Technical support team knows the product well and has always helped in a timely and accurate manner.
Pros
We have used it for quite a few years now and it has given us good insight into the firms overall performance on projects. We have used those results to fine tune or pricing.
Cons
We have not had any significant problems over the course of using it. The interface does require quite a few clicks to get things done
![](/images/avatar.png)
Invoicing quickly has helped me get my new business off the ground
I love the “real time” time and expense additions so that I can bill time and then invoice in the very next step. Invoicing quickly has helped me get my new business off the ground and some cash flow coming in. Color coding of the status on jobs is a wonderful addition and makes a quick glance to get info very easy. I’m getting better with the accounting side of things, and am still learning. BQE Core is doing what I need it to do to track jobs and invoicing. I feel it can grow along with my business.
Pros
Easy to jump right in get things set up and start working. Progressive customization allows for constant improvement of tracking and workflows. There is a LOT of bang for your buck here.
Cons
Having multiple tabs open would be helpful from a workflow standpoint. It would be nice if when I make changes in the Global settings that I could tell it to apply those to older jobs&Im thinking invoicing here. Two of my overall big requests would be: 1) the ability to add some of the custom fields to an invoice. I have to populate this manually&I have to switch between jobs and the invoice to grab the info&therein comes the multiple tabs option. 2) The other would be to auto-populate the basic job information in a standard/form letter. I send out engagement letters on every job and would like the letter creation to be auto-populated.
![](/images/avatar.png)
- Professional Services
- 1-10 employees
- Annual revenue $0-$1M
BQE has made it easy for us to track time, see profits and productivity
BQE has made it easy for us to track time, see profits and the productivity in the staff. The staff! Everyone I have interacted with over the years has been amazing!! They are always tremendously helpful in setting up the software for my new firm! Even doing this for another company once before… I had IT last time and BQE support team was patient and walked me through the process with such patience and they truly love what they do!!!
Pros
Tracking time, profits and overall productivity of the firm.
Cons
would like to have pull down options for tasks so not inventing wheel every time.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Reporting in Core is easy to use
Reporting in Core is easy to use. Our staff is liking the Core interface better as it is user friendly. We are very happy that we switched from BillQuick to Core. In our engineering firm we use Core for managing timesheets, expense reporting, billing, accounting and project management.
Pros
Reports and interface
Cons
I don't like that I can't move employee expenses around after they have been paid. They have been several times when I need to move expense to a different phase of a project but can't
![](/images/avatar.png)
- Construction & Engineering
- 51-250 employees
- Annual revenue $10M-$50M
Overall choosing CORE was a timely solution
Using CORE has expedited our entire AR process which is good for cash flow. I like having everything in one place. Our entire billing process is much simpler now. Easy to create and send invoices to our clients and they look very professional Tracking everyone’s time provides additional insight into our productivity.
Pros
Overall choosing CORE was a timely solution which provided the integrated systems we need for increased overall productivity in all areas. We can see how long the work takes, this helps us both manage our time and give precise quotes for work. We can track our progress and bill efficiently.
Cons
The system can be a bit inconsistent sometimes, a little glitchy and support and regular updates help resolve issues in a timely manner. Would also like to see more report options.
![](/images/avatar.png)
- Professional Services
- 51-250 employees
- Annual revenue $10M-$50M
The ability to call and quickly connect with customer support is very helpful
The ability to call and quickly connect with customer support is very helpful. We have been using Core for more than one year for time tracking, billing, project manager and accounting features. The technical support team is pleasure to speak with and very informative. They are able to help me understand and utilize Core better.
Pros
We love the customer service and Core has helped us track time and do billing in one software
Cons
We suggest there should be a access level to users at the matter level
- Diversified Financial Services
- 1-10 employees
- Annual revenue $0-$1M
Billing process is easy and intuitive
Billing process is easy and intuitive as we can provide clients with a detailed invoicing if required. Core is really helping us manage time and expense tracking. On the project management side we can easily forecast capacity in hours and can create detailed estimates with minimal efforts. Ability to manage subcontractors pretty much like our employees is very helpful. Last but not the least we are enjoying excellent customer service and support.
Pros
Time and expense, project management and billing features in Core have definitely helped us solve problems. Most importantly providing detailed work instructions and budgets to our team.
Cons
Improving intelligence for notification features.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Core has allowed us to keep all eggs in the same basket
Core has allowed us to keep all eggs in the same basket. Billing team using the same program as timesheets has saved hours. Setup of Core was easy. Training has been very supportive and useful. Support has been very helpful and quick to respond and follow-up. BQE Core has allowed us more time to focus on the completion of a project rather than collecting information and scheduling from different sources
Pros
Definitely billing and time tracking. Having one integrated platform is saving us time.
Cons
Providing more details in help within the program, a pop up link to a detailed explanation of what the field is will be helpful.
![](/images/avatar.png)
The fact that we do not have to deal with multiple apps
The real time performance metrics of projects on beautiful dashboards keep our management team informed about the project management aspects of our projects. Invoicing is very flexible and easily supports different invoice formats. I am very pleased with what I am experiencing with CORE. It’s simplicity in Time and Expense tracking and the way it handles all types of invoicing needs of design professional services is excellent.
Pros
The fact that we do not have to deal with multiple apps to run our firm is in itself a huge deal. Time and expense reporting, invoicing, accounting and project management are the areas of our business that are solved by Core
Cons
Cannot think of anything specifically. However, more industry specific chart of accounts will be helpful to users from different industries
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
The flexibility of Core is exceptional
The flexibility of Core is exceptional, and their technical support is top notch. Core has helped us manage our projects and streamline our billing process, which includes 3-tier structure. Prior to Core we use to use excel to manage our multiple database.
Pros
Easy time tracking, expense reports and billing are some of the best features we like in Core
Cons
As soon as Core includes Payroll we will have everything in Core
CORE has given us access to company financial data anywhere
CORE has given our principals and project managers more access to real time data reducing the potential for errors in reporting and data transfer in multiple areas to better service our valued clients. CORE has eliminated need for complicated spreadsheets and various other methods of housing project data. Coming from QuickBooks desktop accounting which we have used for almost 19 years, CORE accounting subscription has given us access to company financial data anywhere.
Pros
Project management and accounting real time data metrics anytime and almost anywhere through cloud based hosted subscriptions allowing quick response time to our valued clients.
Cons
Online Payment: sometimes Client have complained that payment functionality does not work. Would like to also see ACH payment option available which is promised to be in Core in August.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
We use Core in all roles of our business
We use Core in all roles of our business - Time Tracking, Invoicing, Project Management and Accounting and I am increasingly impressed at the capacity of BQE Core and it’s abilities. There are many ways we see Core streamlining our business processes.
Pros
First and foremost is the technical support team! Each call I have made to them has increased my operational knowledge of Core and provided needed assistance with resolving issues
Cons
We would like to see more information/description links
![](/images/avatar.png)
- Industrial Conglomerates
- 1-10 employees
- Annual revenue $0-$1M
All aspects of project management and keeping track of accounting records
All aspects of project management and keeping track of accounting records all in one place. When I began working at RBM, invoices were being generated through excel and snail mailed which took almost a week to complete especially when having to retrieve weekly timesheets. With BQE, this process takes less than 1 day to complete.
Pros
BQE keeps all project management and keeping track of accounting records all in one place. BQE support is genius. After explaining a situation for a project our firm will be performing in the next month, he was able to assist me with not only the setup but had some suggestions with regard to report filtering to reduce time spent on what I think would have been a monumental and time consuming task. Support team is an asset to your organization.
Cons
I've encountered issues in the past that have affected prior year's data and researching is extremely time consuming. However, I haven't encountered these issues in the past 2 years - yeah!
![](/images/avatar.png)
- Diversified Financial Services
- 11-50 employees
- Annual revenue $1M-$10M
BQE Core is very user friendly
BQE Core is very user friendly. We have been using the software for little over a year and it has definitely helped us get efficient. The time entry process is extremely easy and it has improved the way we process invoices and make payments.
Pros
Ease of use because of user friendly interface, time tracking and invoicing are the other two areas that has solved our pain points
Cons
Some of the reports needs better explanation
![](/images/avatar.png)
- Diversified Financial Services
- 1-10 employees
- Annual revenue $1M-$10M
It has met all of my needs so far
It took me many years working in a very outdated software until I felt I found the right program (Core) to switch to for time and billing. It has met all of my needs so far! Love it. I have not had to call in for customer service often but when I do everyone has been helpful and I have not encountered any issues what so ever. I have not worked in the Project Management or Accounting modules of the program. The flexibility for invoicing. The ability to email the invoices right from the program.
Pros
Being able to use the program from anywhere a browser is available although I personally have not had to log in anywhere other than the office but some of my staff has. Core has also solved Time and Billing and reporting pain points and these are the areas what we mostly use Core for. It has met all of our needs so far.
Cons
The downside is the refresh rate. At times there is lag due to internet connection which is obviously not an issue with Core itself but the internet connection.
![](/images/avatar.png)
- Diversified Financial Services
- 51-250 employees
- Annual revenue $50M-$100M
All the processes are faster and better with Core
After switching to Core it has definitely helped us get more organized. BQE Core has a easy and intuitive user interface which makes our day to day processes easier. With Core being a cloud software close to 200 employees are using it on a daily basis for time and expense tracking, billing and engagement management. All the processes are faster and better with Core. It is is our main business management software and before BQE Core we had a local system installed on our servers
Pros
The easy and intuitive user interface allows our staff capture time and expenses in time and helps our team of 50 plus billing managers invoice accurately and on time.
Cons
More options to customize invoices and reports by ourselves will be greatly appreciated.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
We are getting more and more use out of Core
We are getting more and more use out of Core in a little over 1 year of using the software. So far we are just diving in, but it has helped our time tracking and expenses and keep our documents in one place. We are using our custom report for allocations and it is working well for us.
Pros
Allocation and forecasting, project management and time and expense setup are all helpful features in Core to run the business
Cons
Any changes, we pass through ideas and so hopefully they are updated as new features - we would like to know the status of our requests just so we can discuss in our meetings.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
For Architects Core is by far the best product
We have been using Core for more than year and a half. After testing many other products in the market when we were deciding to switch, I can now say for Architects Core is by far the best product. And your ongoing feature videos are the best learning tools. The features and power are so vast that I believe BQE should offer certification courses for Core. We still are in early stages of exploring all the amazing features of Core, but there is no question as a firm we have become more disciplined in managing client expectation on budget and project performance as a whole.
Pros
We definitely like; Reports, especially project analysis and performances. The ability to activate / deactivate phases on a project. We have been invoicing out of Core and recently I am appreciating ePayments and stripe integration and project management dashboard.
Cons
We are not utilizing the allocation and forecasting feature to its full extent till all our scheduling needs are met. We have submitted our feedback and overall BQE is doing a fantastic job listening to user feedback
![](/images/avatar.png)
Love the customer service
Love the customer service. Recently, I needed a help with resolving a report issue I was having the support engineer came straight to my aide. I really enjoy BQE software it really makes our report process much cleaner and quicker.
Pros
Time entry, reports and of course the customer service.
Cons
It would be nice to have a chat box in the bottom of the screen for tech support.
![](/images/avatar.png)
- Professional Services
- 1-10 employees
- Annual revenue $0-$1M
We use Core for time and expense entry, project management
That it is available online is a big plus for us. So far most of our employees have transitioned from the old software to Core fairly easily.
Pros
We use Core for time and expense entry, project management and project tracking, and we are very satisfied with the results.
Cons
I'd like easier access for at least one other employee to enter vendor bill expenses without subscribing to a billing subscription.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Invoicing and time tracking are the features we enjoy the most
The centralized time keeping and invoicing works great for us. The invoicing platform is particularly neat as all our employees track the project time and expenses in Core.
Pros
Invoicing and time tracking are the features we enjoy the most.
Cons
Gant chart feature needs improvement before we can fully use it.
![](/images/avatar.png)
- Professional Services
- 1-10 employees
- Annual revenue $0-$1M
Integral in helping us to understand and grow our business
As a startup, I was researching for the best integrated accounting, time and expense tracking and billing software. I selected BQE Core because it had an intuitive interface, easy reporting and it was on cloud. For any startup business the cost is always a big factor, the fact that BQE Core was a fraction of other similar software packages was an added bonus! We use BQE for our integrated accounting, time/expenses, and invoices, and it has been integral in helping us to understand and grow our business in the first year. At every moment, I have the info available to understand my cash flow, liabilities and A/R all in one interface, which never would have been possible if I used other accounting software.
Pros
We use Core for our integrated accounting, time/expenses, and invoices, and it has been integral in helping us to understand and grow our business in the first year. I was really happy with the initial experience of Core. If you have a base-level understanding of accounting, just watching the instructional videos will give enough information to set up your full account. Having staff available 24/7 for questions has also been very helpful when you're stuck and figuring something out during late-night invoicing!
Cons
At this point it serves our needs but I am pretty sure we will have suggestions for improvement.
![](/images/avatar.png)
- Specialized Consumer Services
- 11-50 employees
- Annual revenue $1M-$10M
Moving to Core has definitely helped us eliminate the manual data entry process
Moving to Core has definitely helped us eliminate the manual data entry process. Prior to using Core the time entry process was not that easy and we had to enter time manually for all the employees in our old software. Another area that so far we like in Core is the powerful invoicing.
Pros
Easy time entry and invoicing feature are the best so far that we enjoy in Core. We also appreciate the excellent customer service support team. They always go above and beyond to help out.
Cons
Needs to be more user friendly. At time we did experience glitches which were rectified in a timely manner.
- Professional Services
- 1-10 employees
- Annual revenue $0-$1M
we were particularly impressed with CORE's user-friendly, "all in one" design
Our small but rapidly-growing architectural firm was looking for a project management and billing solution. We were particularly impressed with CORE’s user-friendly, “all in one” design.
Pros
It provides us with a single source to record employee time, manage project tasks, budget, invoice and track project performance. We took advantage of the various training packages and technical assistance BQE offers to help us get up-to-speed with CORE in a matter of months. BQE also worked with us to develop a custom invoice that provides our clients with current and past billing information in a clean and easy-to-read format. With the mobile app, our partners access CORE data anytime, anywhere, and can record travel expenses directly from their smartphones. BQE has demonstrated to us that they listen and responds to suggestions on how to make CORE an even better program for its users by providing regular updates and enhancements that incorporate our suggestions. We are very pleased with CORE and BQE."
Cons
Everything is working for us and if it does not then that is what support is for. Like any other new software implementation there is a learning curve. We took advantage of the various training packages
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Time management and auto reports have helped us a lot
We are an architecture firm and it is clear Core is geared to us. We are new to Core, so it’s hard for me to name features i like most. Definitely like it. Time management and auto reports have helped us a lot. What I love so far is the 24 hour support. The agent I usually speak with has been especially helpful. He is patient and a great teacher. He points out issues/features that I had no idea about. He has been extremely helpful.
Pros
Software is has features for our industry. As mentioned support is great and so far we have benefited from time management and report automation
Cons
I would like to see more free webinars about new features, or tips.
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
The transition was extremely smooth
After using BillQuick for more than 10 years we switched over to Core. The transition was extremely smooth. Core is an excellent product which my staff transitioned to with ease. The online tutorials were so good that staff just dove right in to working with Core with almost no support needed.
Any questions that I have as I was setting things up were quickly answered but staff who are always quick to respond, extremely knowledgeable and always friendly. I would definitely recommend Core to anyone!
Pros
User friendliness and definitely excellent customer service
Cons
Would like to see incomplete time card monitoring soon in Core. I was told it is already on the road map.
![](/images/avatar.png)
- Diversified Telecommunication Services
- 251-1K employees
- Annual revenue $50M-$100M
FLEXIBILITY--Some projects require slightly different reporting/invoicing formats
Prior to using BQE software I used Wind-2 and SEMA4 which are costly programs. I was not a newbie to using project management software when implementing BQE. My greatest frustration in using those legacy programs was that they did not have any flexibility in them that allowed me to update or “correct” erroneous entries into the system database without having the data reprogrammed in some way by the vendor. Support for BQE can assist making changes on the fly if need be and hopefully will continue to support the services industry in the future. I have witnessed the mission of BQE to continue to improve the software and support for its users. I am happy to say that I took a leap of faith in upgrading my office to BQE and have not been disappointed.
Pros
SIMPLICITY--it is an easy transition from paper time sheets in a format that employees can easily understand. Employee time entries can add memos that are invaluable to explain charges to clients or counsel employees on their activities. FLEXIBILITY--Some projects require slightly different reporting/invoicing formats to fit the client;s needs. BQE support assists with accomplishing just that at a reasonable cost. SUPPORT--With a gold support subscription, issues in understanding inputs or reporting have been addressed in real-time, on-line, to help maintain operation schedules for billing and reporting. REPORTS--Both summary and detailed reports are available that can include memos to help clarify time and expenses. One can look at a project from different facets based on a manager's needs.
Cons
Some of the labor reporting modules need to be reviewed that use an integer formatted numbers that round off and be updated to use an accounting formatted number with 2 decimal places. My accounting department uses two report for payroll that use incorrect time (rounding up) instead of an exact job time/cost figure
![](/images/avatar.png)
- Diversified Financial Services
- 51-250 employees
- Annual revenue $10M-$50M
Core has been a huge time savings for us
Core has been a huge time savings for us. The ease of creating invoices, making and customizing reports, and entering time has improved our ability to get more done overall. We have been very pleased with all aspects of customer service, the integration team, custom reports team, trainers, and call center for the one off type questions and issues. We would recommend Core to anyone on the fence about the service. It is such a user-friendly software program.
Pros
it is such a user-friendly software program and the customer service is definitely great.
Cons
There was a bit of a learning curve in the beginning and training coordination was somewhat challenging but nothing extraordinary.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Having project assignments, time tracking using the multiple timers
Having project assignments, time tracking using the multiple timers and of course recurring billing for automating our invoicing process are the most productive features of Core. We are done with entering data, so far, i am liking everything I see and I am looking forward to seeing the reports. Employees enter their own time. Recurring bills negate entering the same info each month.
Pros
On the Dashboard, it'd be nice if you had the option to click on a widget, and it takes you to the report.
Cons
On the Dashboard, it'd be nice if you had the option to click on a widget, and it takes you to the report.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
Better time entry and great support
The time card entry process seems to be better than our old system. Lot less steps for our staff to get their time sheets in. We are still in the learning process, I can say one thing about BQE support personnel…they are helpful and very patient and understanding. I appreciate them very much
Pros
Definitely technical support and better time entry
Cons
For vendor ID, you have to choose either a tax ID number or a SSN. Vendor's can be either, so you should be able to have both.
![](/images/avatar.png)
- Construction & Engineering
- 1K-5K employees
- Annual revenue $500M-$1B
The way everything is integrated
What we like the most about Core is the way everything is integrated in one application instead of using standalone apps that do not talk to each other. The ease of pulling up the needed data is definitely helpful. I have liked how some of my suggestions to Core ideas have been implemented. If more of these could be fixed and added to the software, the use of the software would be more efficient and effective.
Pros
The way everything is integrated. The ease of pulling up needed data
Cons
Although, BQE is working on a payroll module and i have to use a a separate payroll software to process payroll. On projects when you assign a group it doesn't let you assign to all phases and this feature addition would be great.
![](/images/avatar.png)
I liked the flexibility and design once I gone through the learning curve
I liked the flexibility and design once I gone through the learning curve. The reports are straight forward and serve my purpose without customizing.
Pros
I have used BQE products for years and the software is simple to use and pretty straight forward. Today was the first time I needed customer support. The response was as always excellent and the problem that I was experiencing was fixed.
Cons
I find the billing process steps a bit awkward but I am used to them now. It is annoying to have to look for the most recent invoice under Invoice Review once the invoice is processed as final.
![](/images/avatar.png)
- Professional Services
- 1-10 employees
- Annual revenue $1M-$10M
The flexibility of customizing features to meet our needs
We transferred 12 years of “Project History” to bqe-CORE effective January 1, 2019. I am the Business Manager and I report directly to the owner of the Company. I keep current the clients we work with&…and all project-phase information for the company, billing-invoicing, using the CORE operating system. As a former Marine Corps officer&. then commercial banker (15 years) I believe that People make the difference&… not machines. The people at bqe CORE, particularly the HELP DESK, are all professionals they know what they are talking about and they care. I highly recommend bqe CORE!
I value honesty, and I value those that take ownership. I recommend bqe-CORE. I just designed a ‘custom report’ for our company utilizing the CORE ‘Custom Report’ section. They were great to work with. We are now using “my” Company report starting January 2020. This “custom report” pulls in all our client “project data” real time. It shows what’s important to us&. our project team. We have many concurrent project-phases (hourly or not to exceed contract phases) under the parent project, that start one year and end the next. This custom report is a great tool for us& color-coded “RED”, showing when over budget (time or “not to exceed” contract fee).
Pros
The flexibility of customizing features to meet our growing business needs. he people at bqe CORE, particularly the HELP DESK, are all professionals
Cons
It would be nice to see more built in invoice/report customization features.
![](/images/avatar.png)
- Professional Services
- 11-50 employees
- Annual revenue $1M-$10M
Time entries are easy for the project managers
Time entries are easy for the project managers. When everything is entered correctly Core does give a good view as to where we are with invoicing, budgets, contract etc. For most part calling customer service is easy and the staff is knowledgeable and patient when we are asking for help.
Pros
We love the customer service and of course ease of use with robust features is a plus.
Cons
I am not a fan of write up/down feature and wish we could turn it off as our firm does not use it. There is room for improvement in reporting area as find some reports do not show totals at the bottom and more invoice customization options would definitely help.
![](/images/avatar.png)
- Professional Services
- 1-10 employees
- Annual revenue $1M-$10M
I'm constantly amazed how well thought-out the original approach was
I have to say it has succeeded with flying colors after being bombarded with all kinds of unusual circumstances with hundreds of our architecture projects! Well done! I’m constantly amazed how well thought-out the original approach was in Core’s basic design allowing it to handle all of our client’s weird situations, and we’re just one of the zillions of other companies using Core who do things so differently than we do. I say this with a little authority, as well, because I wrote my first program at age 15 in 1968 and I have seen (and suffered) everything in all the eras of computing since. Core is badass. Every system has issues, but it’s important we all stop and appreciate the unimaginable amount of work that went into making Core really effective. No one paid me to say this and I’m not getting any brownie points. I’m saying this because I know intimately what the developers have gone through to make today’s Core possible. Whew!
Pros
Core's powerful time and expense tracking, simple but yet powerful invoicing and amazing project management features makes it a power house. I'm constantly amazed how well thought-out the original approach was in Core's basic design allowing it to handle all of our client's weird situations, and we're just one of the zillions of other companies using Core who do things so differently than we do.
Cons
Core has an amazing catalog of built-in reports. One thing we find ourselves often wishing for was a kind of Quick List report that would output a list of something, one item per line, single-spaced and nothing else but a clear statement of the search and filtering criteria at the top.
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
BQE Core was at the top of our list
BQE Core was at the top of our list when our company was researching a replacement for our current accounting software. The cloud-based software was a great solution, but ultimately we decided to go with another software because our CEO decided that a local server-based system was a better fit for our company.
Pros
I was impressed with how much thought was put into the creation of this software and how many steps we would have been able to cut out of our daily routine by using this software.
Cons
I think if they offered a local server-based version that worked exactly like their cloud-based software, we might have made a different decision.
![](/images/avatar.png)
Everyone at the office fell in love with Core immediately
By far one of the most beautiful and powerful software for engineers and architects. We switched from a very expensive software. Everyone at the office fell in love with Core immediately. Highly recommend.
Pros
The business intelligence and the entire BQE support team.
Cons
I wish it had payroll. I have to export the payroll report every two weeks. No big deal though.
![](/images/avatar.png)
BQE CORE Review
An integrated system that allows for bookkeeping along with project management. BillQuick back ends into Quickbooks for full accounting features. Employees enter their time, supplier bills are entered and invoices are created with full costs of a project available easily in the same system.
Pros
Allows for project management as well as project profitability. Ease of use.
Cons
Some issues getting the taxes to work right for our purposes. I spent a lot of time using Crystal Reports to customize the reports we use.
![](/images/avatar.png)
- Industrial Conglomerates
- 1-10 employees
- Annual revenue $0-$1M
BQE CORE Review
We use BillQuick (BQE) to keep track of time on projects (as we are an engineering firm), bill, receive payments and generate financial statements. This program allows billing of time in many ways - phased fixed fee, fixed fee, hourly, etc. and through email as well. The program has several reports for job cost/billing/WIP/profitablity, etc.
Although BQE has the capability of integrating with other accounting software, I did not want to have to keep track of 2 different programs, so we purchased their version with the accounting feature (2012). The usual reports-Balance Sheet, Income Statement are more than sufficient and meet our needs. They are still tweaking some features/reports in this area but this program allows almost anything to be exported to excel so you can modify whatever you need. The can also create a report for you for a fee.
Since we run our payroll through an outside party, I don’t require this feature, which in my opinion, would greatly increase the cost of the program.
I would highly recommend utilizing the trial feature that BQE offers to get a better idea of the features and reports.
I find this program an excellent tool for businesses that are too small for software that exceeds $10,000 and too large for Quickbooks and/or Peachtree that require extensive time recordkeeping.
Pros
I have cut down on my billing time from days to hours. The fact that I can email invoices has saved me lots of time. One option is to automatically send an email to clients as soon as a payment is posted. This has been a plus as clients appreciate acknowledgement and thanks. I love the fact you can generate pre-billing reports and email to project managers and they can respond "yes/no" to bill and whether to mark up or down on an invoice before finalizing.
Cons
The general ledger has a "write up/down adjustment" feature that is built in, but doesn't hit a specific account. This was an issue when I first purchased it, but since then I haven't had it show up. I did mention to the support team that this needs tweaking. There should never be a debit without an offsetting credit anywhere. It is my understanding this is being worked on. They also are working on (one of my wishlist items) - Statement of Cash Flows.
![](/images/avatar.png)
- Internet Software & Services
- 11-50 employees
- Annual revenue $1M-$10M
BQE CORE Review
I think the product has a lot of functionality. It does not have an intuitive user interface.
Pros
Functionality
Cons
Not sure how to use the functionality--the interface is not intuitive
![](/images/avatar.png)
- Construction & Engineering
- 11-50 employees
- Annual revenue $1M-$10M
BQE CORE Review
Project Financial Management software, with invoicing capability.
Pros
It allows us to financially manage our engineering services, invoice our clients and develop financial reports.
Cons
We paid to have the software firm set us up, which later required considerable adjustment. We pay for the VIP call in service because it is not a simple system to set-up or operate, but the final results are good.
![](/images/avatar.png)
- Construction & Engineering
- 1-10 employees
- Annual revenue $0-$1M
BQE CORE Review
It not only keeps track of time and expenses but also breaks that down to phase of project and individual doing the work. I am still learning the software but what I am using is very impressive. generation of invoices and reports is simple an thorough. I would recommend this software for anyone that performs constantly varying, phased type of service.
Pros
It is very well thought out and it is obvious that it was developed by someone that had worked on projects of the type I do.
Cons
There is a lot I do not yet understand though that is a result of my busy schedule and not the software.