9.2
Editor’s Rating:
Best for Growing Contractors
Contractor Foreman: Contractor Foreman Financials
Contractor Foreman
  • 100-day money-back guarantee on select plans
  • Integrates with QuickBooks, Gusto, and Stripe
  • Residential and commercial
8.7
Editor’s Rating:
Best Building Information Modeling (BIM) Integration
Autodesk Forma Build: Autodesk Build Project Management
Autodesk Forma Build
  • Allows photo uploads to show project progress
  • Encourages collaboration between users and contractors
  • Responsive technical support team
8.2
Editor’s Rating:
Best for General Contractors
Procore: Portfolio
Procore
  • Automates emails, document sharing, and photo archiving
  • Customizable reporting
  • Integration with AutoCAD and Revit

Whether you’re just getting started in construction or you’ve been managing projects for many years, find solutions that streamline estimating and bidding, project scheduling, field management, and integrated job costing. We used our advanced review methodology to evaluate the best construction management software.

Contractor Foreman - Best for Growing Contractors

Contractor Foreman helps contractors keep clients informed and up to date on each job’s progress with a dedicated client portal. This is especially important for residential contractors with clients eager to stay informed about each project step. Contractor Foreman is also affordable at $49/user/month, billed annually; however, it does not include the client portal out of the box. This requires users to go with the Pro plan, which costs $221/month. Still, this is less expensive than larger options like Procore.

The client portal lets contractors fully customize the information shared, tailoring it to each client’s needs and preferences. This ensures that sensitive or non-essential details remain secure and private. This saves you time by cutting down on client communication, allowing you to focus on overseeing projects. The portal includes the following capabilities:

  • Estimates: Let clients approve or deny estimates directly from the portal.
  • Change orders: Let clients suggest or submit project changes and receive updated pricing when those changes are made.
  • Project updates: Provide updates to clients when you hit specific milestones, such as completion of flooring installation, electrical work, or inspections.
  • Project documents: Upload pictures or files of the job site so clients can view daily progress or review previous plans or proposals.
  • Invoices: Let clients pay for completed work directly from the portal, simplifying the billing process.
Client portal in Contractor Foreman

While it’s great for residential builders, Contractor Foreman can work in the commercial sector, too. It handles AIA G702/G703 progress invoicing, along with RFIs and bid management to help you hold budgets on multi-phase projects. While it may be too light for running $5M+ projects, its features and low price make it a solid option for small to midsize commercial and residential firms.

Contractor Foreman
★★★★★
★★★★★
(14)

Contractor Foreman: Contractor Foreman Financials
Contractor Foreman: Contractor Foreman Project Details
Contractor Foreman: Contractor Foreman Project Manager
Contractor Foreman: Contractor Foreman Kanban Report
Contractor Foreman: Dashboard with Project Stats
Contractor Foreman: Dashboard
Contractor Foreman: Drawer Menu
Contractor Foreman: Chat
Contractor Foreman: Time Card
Contractor Foreman: Contractor
Contractor Foreman: Daily Log
Contractor Foreman: Estimate
Contractor Foreman: File Photo
Contractor Foreman: PDF
What We Like
100-day money-back guarantee on select plans
Integrates with QuickBooks, Gusto, and Stripe
Residential and commercial
What We Don’t Like
Manual data uploads for certain financial platforms
Does not include accounting
Overview
Price Range: $$
Starting Price: $49/month
Client OS: iOS, Android, Web
Deployment: Cloud Hosted

Read our full Contractor Foreman review.

Autodesk Forma Build - Best Building Information Modeling (BIM) Integration

Autodesk Forma Build’s BIM integration can enhance project coordination and improve your decision-making, helping minimize errors and streamline your construction workflows. In the pre-construction phase, you’ll need to collaborate with architects and engineers to develop a 3D BIM model using tools like Revit or AutoCAD. This foundational model allows you to integrate advanced features throughout the project lifecycle.

For example, the system’s quantity takeoff capabilities can generate accurate material lists directly from the model, allowing for precise procurement planning. Additionally, a 4D simulation can link your construction timeline to the model so you can visualize the sequence of activities and optimize resource allocation.

Your on-site teams can then use their tablets to access the BIM model, which ensures that everyone has the latest version and eliminates the need for paper plans. Any field dates, such as modifications to electrical wiring, can automatically be logged in the model and shared with your team. You can then provide your client with the final model that includes all detailed documentation for facilities management and future renovations.

This construction manager software best serves contractors already using other Autodesk Forma products like Forma Data Management and Forma Design Collaboration. It starts at $175/user/month or $1,400/user/year with the annual billing discount. Smaller companies may struggle to justify the investment, especially if they’re not already in the Autodesk ecosystem.

Best Building Information Modeling (BIM) Integration:
Autodesk Forma Build
★★★★★
★★★★★
(2)

Autodesk Forma Build: Autodesk Build Project Management
Autodesk Forma Build: Autodesk Build Schedule
Autodesk Forma Build: Autodesk Build
Autodesk Forma Build: Autodesk Build RFIs
Autodesk Forma Build: Autodesk Build Sheets
Autodesk Forma Build: Projects
Autodesk Forma Build: Projects Grid View
Autodesk Forma Build: Blueprint View
Autodesk Forma Build: Set Status
What We Like
Allows photo uploads to show project progress
Encourages collaboration between users and contractors
Responsive technical support team
What We Don’t Like
Limited field report features
Expensive for smaller businesses
Overview
Price Range: $$$
Starting Price: $175/user/month
Client OS: Web
Deployment: Cloud Hosted

Learn more about Forma Build features and pricing.

Procore - Best for General Contractors

Procore simplifies bid management, for general contractors struggling with multiple subcontractor bids. Along with its full project management suite, this construction software lets you quickly organize and select the most competitive bids.

You can create bid packages by entering general information like bid number, due date, bidding instructions, and project overview, with the option to save these as templates for efficiency. You can also attach and update drawings, documents, and job specifications when changes occur, ensuring the bid reflects the latest details.

From there, select and filter subcontractors by location, trade, pre-qualification, or type, such as small, women-owned, or minority-owned businesses. Once finalized, Procore sends the bid packages to the selected subs, letting you track views, document access, and recent updates.

Buildertrend is another popular choice for general contractors, known for its user-friendly interface and streamlined bid request and proposal management. However, it lacks the sophisticated tracking and analytics tools Procore offers, making Procore better suited for general contractors handling multiple larger, more complex projects. Procore’s strength lies in its ability to manage multi-phase bids and its automation features. Its pricing starts at $375/month though final costs depend on your annual construction volume (ACV), which can be a drawback for smaller contractors.

For general contractors looking for a more standardized pricing model, we recommend comparable options such as 123Worx.

Procore
★★★★★
★★★★★
(5)

Procore: Portfolio
Procore: RFIs
Procore: RFIs - General Information
Procore: Current Drawings
Procore: Drawings
What We Like
Automates emails, document sharing, and photo archiving
Customizable reporting
Integration with AutoCAD and Revit
What We Don’t Like
Custom pricing model means limited price data available.
Learning curve for new users means training is required
Overview
Price Range: $$$
Starting Price: $10,000/year
Client OS: Web
Deployment: Cloud Hosted

Read our full Procore review.

Buildertrend - Best for Home Builders

Buildertrend offers a dedicated module that streamlines warranty claims management for home builders, protecting your company’s reputation. A structured process not only improves client satisfaction but also boosts referrals and repeat business, setting great builders apart from the rest.

With Buildertrend, you can easily store all warranty documentation for each home, including manufacturer warranties and your builder’s own coverage for workmanship, structural defects, and major systems like HVAC, plumbing, and electrical.

Buildertrend Warranty Claim Management
Manage warranty claims and set follow-up appointments in Buildertrend

According to WarrantyWeek, D.R. Horton, the country’s largest home builder, set aside $210 million in warranty accruals in 2024, up 7% year over year, ending the year with a $570 million warranty reserve balance. Buildertrend simplifies the process for both homeowners and contractors. Homeowners can easily log into their portal and submit claims by detailing the issue, setting priorities, and uploading supporting documents. You’ll receive these claims automatically, enabling quick follow-up.

From there, you can assign a team member or trade partner to address the issue. The contractor who performed the work is notified, and if approved, you can schedule a service appointment or allow the contractor to coordinate directly with the homeowner.

After resolving the claim, homeowners can leave feedback, helping to build trust and secure future referrals and positive reviews. Buildertrend starts at $499/month, making it a solid choice for small to mid-sized construction companies with 10-50 employees and annual revenues between $1 million and $15 million.

Buildertrend
★★★★★
★★★★★
(10)

Buildertrend: Dashboard
Buildertrend: To-Do Filters
Buildertrend: Daily Logs and Timeclock
Buildertrend: Jobs Menu
Buildertrend: Project Schedule
Buildertrend: Photo Upload
What We Like
User-friendly interface and mobile access
Homeowner portal for customer service
Strong filtering and reporting tools
What We Don’t Like
Non-customizable workflow
Print-outs lack project details
Limited CRM and marketing tools
Overview
Client OS: iOS, Android, Web
Deployment: Cloud Hosted

Read our full Buildertrend review.

Houzz Pro - Best for Renovations and Remodels

Houzz Pro equips contractors with tools to source new clients and deliver impressive models of their remodeled spaces. The 3D visualization tool lets you scan a room with any mobile device, creating an accurate floor plan and 3D model. Once the scan is complete, you can work with clients to add cabinets, windows, fixtures, and even furniture, visually showcasing the finished project. Entire walls can be moved or kitchen islands added, enabling homeowners to explore all their renovation options.

Create a 3d floor plan in Houzz Pro

To add more precision to these 3D visualizations, Houzz Pro partners with industry leaders like Sherwin-Williams and Kohler, providing exact product details and measurements for items the client selects. Even if a brand isn’t partnered, contractors can easily pull product pricing data from suppliers’ websites or their own price books, speeding up the quoting and design process.

Additionally, Houzz Pro offers a walkthrough mode that allows clients to virtually stand in spaces, rather than squinting at floor plans. If they want to move a window or change a tile choice, you can make the adjustment on the spot so they can see the immediate impact. Plus, you can add comments on specific elements, like “client wants to move door here,” so your subs know exactly what’s happening in each room.

Houzz Pro’s Essentials plan for designers starts at $249/month, including the 3D planner tool. With competing bids forcing prices to the ground, having a tool like Houzz Pro allows you to build trust with homeowners, decrease the time it takes to quote projects, and leverage new technology to win more jobs.

Houzz Pro
★★★★★
★★★★★
(2)

Houzz Pro: 3D Floor Plan
Houzz Pro: Homepage
Houzz Pro: AI Estimate Builder
Houzz Pro: Schedule Gantt View
Houzz Pro: Moon Board
Houzz Pro: Takeoffs
Houzz Pro: Assembly
Houzz Pro: Selections Tracker
Houzz Pro: Tasks
Houzz Pro: Budget
What We Like
Platform is user-friendly and requires minimal training
Basic plan with a Pro directory listing is free
Includes marketing and advertising tools
What We Don’t Like
UI is fairly basic compared to competitors
Project match leads do not always meet lead requirements
Limited website customization
Overview
Price Range: $$$
Starting Price: $99/month
Client OS: iOS, Android, Web
Deployment: Cloud Hosted

Read our full Houzz Pro review.

InEight - Best for Capital Project Contractors

InEight integrates schedule, risk, and design, making it a strong option for capital project management. The scheduling tool uses AI and previous project data to build a timeline without starting from scratch. All you need to do is enter your parameters, and the system recommends a schedule. From there, simply input the details you want to reflect real-world activity sequences, durations, and known risks.

InEight Commercial Project Plan
Create a full project plan using InEight.

Once the schedule is set, the risk engine becomes part of everyday project control. It identifies threats, recommends mitigation steps, and tracks whether those actions are actually happening. This helps you not only implement realistic plans but also adjust to risk and ensure your team executes effective mitigation strategies. It can save capital contractors millions by gaining clarity across the entire program.

From there, the Cost Risk engine ties everything together. When a schedule shifts, the cost exposure adjusts automatically, giving you one unified view of total project risk instead of two disconnected interpretations. This is huge for capital project leaders, as it delivers real-time visibility and predictability that the industry commonly lacks.

InEight offers a modular end-to-end suite for large contractors and owners that need comprehensive project management. Other tools include document management, estimating, and portfolio and project reporting. Due to the modular architecture, pricing is customized and requires a quote based on the size of your company and the specific features you need.

Best for Capital Project Contractors:
InEight
★★★★★
★★★★★
(4)

InEight: Document
InEight: Model
InEight: Model
InEight: Detailed Plan
InEight: Scheduling
InEight: Cost Breakdown Structure
InEight: Bid Wizard
What We Like
Supports “what-if” scenario analyses
Various bid packages for Permanent Material, Freight, etc.
Takeoff database uses historical data for future projects
What We Don’t Like
Initial learning curve
Complex navigation
Overview
Price Range: $$$
Client OS: Windows, macOS, iOS, Android, Web
Deployment: Cloud or On-Premises

See our complete InEight product profile for more info.

JobTread - Best for Growing Residential Contractors

JobTread connects client selections directly to your project budget, so each homeowner decision updates the price and your margin in real time. You build the options into the estimate, like flooring grades, fixtures, or cabinet packages. Then, put them in the client portal, where the homeowner reviews the choices and sees exactly how each one moves the total. From there, approved selections flow back into the budget and proposal with no re-entry.

For residential work that targets a specific pain: selection-heavy jobs where allowances drift and last-minute upgrades can cut margins. Instead of chasing email threads or rebuilding a quote every time a client swaps countertops, the decision, the price, and the paper trail sit in one place. It also reduces change-order disputes, since the client signed off on the number at the time they made the choice.

JobTread Budget Management
Manage individual job budgets in real time using JobTread.

What’s nice about JobTread is its all-in-one pricing model. This means all features are included, and you get unlimited jobs, documents, and files. Pricing is $199/month, plus $20/month/user, with discounts available for annual billing. That said, JobTread is newer than more established platforms like BuilderTrend and Procore, so it lacks broader enterprise project controls. But for simpler contractor workflows, JobTread is a good option.

Best for Growing Residential Contractors:
JobTread
★★★★★
★★★★★
(2)

JobTread: Invoice
JobTread: Bid Request
JobTread: Estimate
JobTread: Job Dashboard
JobTread: Budget
What We Like
Central location for jobs, teams, documents, photos, and more
End-to-end construction management
Includes budgeting, estimating, bidding, invoicing, ad job costing
What We Don’t Like
Limited customer communication options through the app
Integration with QuickBooks is not always smooth
Overview
Price Range: $$
Starting Price: $199/month
Client OS: Web
Deployment: Cloud Hosted

BuildOps - Best for MEP Contractors

BuildOps is designed for mechanical, electrical, and plumbing (MEP) subcontractors who self-perform both large-scale construction projects and recurring field service work. It eliminates the need for two separate systems by combining project tracking and scheduling with service management and dispatching capabilities. While most construction software caters to either project-based contractors or service-focused teams, BuildOps brings both into one platform.

One standout feature is BuildOps’ service dispatch board, which allows office teams to manage technician schedules, track job statuses, and coordinate emergency service calls alongside ongoing construction projects. For contractors juggling installation crews and service technicians, it streamlines employee scheduling to prevent overbooking and project delays. Technicians receive detailed work orders through the mobile app, where they can log materials used, upload jobsite photos, and complete digital service reports.

However, its deep feature set is designed for companies that self-perform across multiple disciplines, which may be overkill for contractors focused solely on service or small-scale projects. Pricing is customized based on company size, with BuildOps best suited for mid-sized to large MEP contractors managing between 25 and 250 field technicians, making it an ideal fit for firms scaling beyond basic service management tools.

BuildOps
★★★★★
★★★★★
(1)

BuildOps: Growth
BuildOps: Customers
BuildOps: Analytics
BuildOps: Visit Summary
BuildOps: Dispatching
BuildOps: Project Management
BuildOps: Scheduling
BuildOps: Service Agreements
What We Like
Integrates with multiple accounting systems
Includes photo and video notes
Includes project bids, contracts, daily logs, and change orders
What We Don’t Like
Pricing not available on developer site
Limitations in customizing job numbers within the software
Software can be sluggish when loading older work orders or images
Overview
Client OS: iOS, Android, Web
Deployment: Cloud Hosted

Premier Construction Software - Best for Integrated Accounting and Payroll

Premier Construction Software or PremierCS, is designed for contractors who want an all-in-one platform. It combines essential project management tools like RFIs, submittals, drawing management, daily logs, and punch lists, with strong construction payroll and accounting modules. Unlike many competitors that rely on outside integrations, PremierCS was built with these tools from the ground up, providing a single source of truth for both field and back-office operations.

Its construction specific-payroll handles union and non-union rules, multiple pay rates and states, benefits, and certified payroll. Field teams can clock in using the mobile app with geo-tagging, and their hours feed into your job cost codes automatically. For construction accounting, PremierCS supports AIA and cost-plus billing, AP invoice automation, and WIP reporting. It can support multi-entity and multi-department accounting for larger organizations.

Together, contractors and project managers can manage everything about their business from a single dashboard, eliminating manual double entries and ensuring everyone is working from the same data. This is especially important in the age of AI, where clean, centralized data helps detect project delays or cost overruns and guide smarter decisions on jobs.

PremierCS is best suited for mid-sized to large contractors, as smaller firms that prefer more plug-and-play tools may find the implementation costs expensive. While the one-time costs may seem steep, the per-user fees will lower as you add more users, and we often hear customers rave about the quality and speed of PremierCS’s implementation teams.

Best for Integrated Accounting and Payroll:
Premier Construction Software
★★★★★
★★★★★
(4)

Premier Construction Software: Job Dashboard
Premier Construction Software: Job Forecast
Premier Construction Software: Submit Invoice
Premier Construction Software: Signature Request
What We Like
Prebuilt job dashboards with comprehensive data representation
Efficient job setup with the ability to copy job structures
Fully integrated drawing management feature with revision tracking
What We Don’t Like
Pricing may be a challenge for smaller businesses or startups
Limited suitability for companies with high service-type work or dispatching requirements
Limited customization options for certain modules or reports
Overview
Price Range: $$$
Client OS: Web
Deployment: Cloud Hosted

To explore alternatives, check out our page on the best construction accounting systems.

JobPlanner - Best Value Option

JobPlanner is a solid construction management software for general contractors, specialty contractors, and homeowners looking for a budget-friendly way to manage construction projects. The job planner tool handles the essentials like bid management, budgeting, invoicing, and change order tracking. Plus, it integrates with leading accounting software such as QuickBooks or Sage, so you can keep your existing accounting systems.

JobPlanner lets you add features as your business grows, with flexible pricing starting at just $25/user/month. However, JobPlanner does not include built-in estimating, so users may need a separate tool for that. But if you’re primarily looking to streamline project management and accounting, this building industry software still delivers strong value for its features.

JobPlanner
★★★★★
★★★★★
(6)

JobPlanner: Reports (New Feature)
JobPlanner: RFI
JobPlanner: Drawing Annotations
JobPlanner: Commitments
JobPlanner: Project Dashboard
JobPlanner: Contracts
JobPlanner: Payable Invoices
JobPlanner: Budget
JobPlanner: Daily Report Summary
JobPlanner: Drawings
What We Like
Competitive, transparent pricing
OCR technology for auto-recognition of drawing numbers
Mobile field apps for iOS and Android
What We Don’t Like
Pricing not publicly shared on the developers website
Overview
Price Range: $
Starting Price: $25/user/month
Client OS: iOS, Android, Web

Read our full JobPlanner review.

Fieldwire - Best Free Plan

Fieldwire offers free construction management software for up to five users and three projects simultaneously. The task engine gives small crews everything they need to coordinate work and record progress, right from their phones.

You can start a task manually or drop a pin on a drawing; each pin stores its X-Y location, CSI category, and an optional location tag, like floor, room, or elevation. From there, you can choose the status (P1-P3 priority), assignee, watchers, start and end dates, and checklist templates. This makes it easier for your team to sort and filter without digging through email chains.

You can snap photos, record videos, attach PDFs, or drop voice-to-text notes to prove progress. Even in remote areas, content syncs the moment you’re somewhere where a connection is available again. Fieldwire notifies assignees and watchers of any changes instantly, and overdue tasks surface automatically in mobile and web views. This can help you spot bottlenecks before they derail your schedule, even for crews with no dedicated PM.

Overall, the free plan is a solid fit if you’re just starting out. However, for tools like RFIs, submittals, change orders, and budgeting, you’ll need the Business Plus plan at $89/user/month.

Best Free Plan:
Fieldwire
★★★★★
★★★★★
(2)

Fieldwire: Specifications Page
Fieldwire: Files Page
Fieldwire: Project Creation Page
Fieldwire: Dashboard
Fieldwire: Fieldwire Scheduling
Fieldwire: Fieldwire Plans
Fieldwire: Fieldwire Form Builder
Fieldwire: Fieldwire Checklist
What We Like
Apps available for Apple and Android devices
Free version available for small teams (5 users)
Instant access to drawings, RFIs, and submittals
What We Don’t Like
Advanced features are locked behind higher priced plans
Mobile performance can be limited by poor cell service in remote areas
Handwritten notes or drawing sketches on plans is difficult and choppy
Overview
Price Range: $$
Starting Price: Free
Client OS: Windows, iOS, Android
Deployment: Cloud Hosted

Learn more about Fieldwire’s subscription plans on our review page.

Systems We Don’t Recommend

  • Monday.com: While Monday.com does offer a system for managing simple projects and tasks, it requires extensive customization to meet the needs of construction management companies.
  • Zoho Projects: Construction projects often require specialized features like BIM integration and cost estimation tools, which Zoho Projects doesn’t natively support.
  • Wrike: The system is a versatile project management software, but it lacks specialized features like RFIs and submittals and field-specific functionalities like mobile field apps.

What is Construction Management Software?

Construction management software is a set of tools that help construction companies and contractors manage their projects from start to finish. These platforms provide capabilities for project scheduling, job costing, budgeting, bid management, and client communication.

Each contractor or company has its own way of managing jobs, so figuring out which software fits your workflow is crucial when adopting software for construction management. Below is a list of common construction industries and what they do.

Types of Contractors

  • General Contractors: They manage the entire construction project, from overseeing subcontractors to procuring materials and scheduling projects. GCs ensure the project meets the required specs and stays on budget from start to finish.

  • Home Builders: Home builders specialize in constructing new residential buildings ranging from custom homes to entire neighborhoods. Like GCs, they manage the material, permits, and subcontractors from start to finish.

  • Specialty Trade Contractors: These contractors focus on specific trades within construction. Some examples include plumbing, electrical, HVAC, or framing. They’re hired because of their specialized knowledge of their trade.

  • Renovation/Remodeling Contractors: These contractors work to improve or refresh existing structures, such as kitchen remodels, home additions, or office updates. They can work on both commercial and residential projects, but they typically handle the entire project themselves.

  • Residential Contractors: Residential contractors specialize in new townhouses, condos, and apartment complexes. They manage projects from site prep to final inspections.

  • Commercial Contractors: Commercial contractors manage projects for buildings such as offices, retail spaces, hotels, or warehouses. They must ensure that buildings meet commercial codes and standards.

  • Civil Contractors: These contractors focus on roads, bridges, and tunnels. They specialize in earthworks site prep and typically do smaller infrastructure projects.

  • Large Infrastructure Contractors: Infrastructure contractors focus on extensive infrastructure projects, including large transportation systems like railroads, highways, utilities, and energy projects.

  • Construction Consultants: Consultants provide expertise and advising services for construction projects. They can manage specific tasks or the entire project. Services range from planning to estimating to ensuring compliance.

Common Challenges

Here are the most common challenges that construction management software is designed to solve:

  • Project Delays: Tight deadlines with unforeseen delays can disrupt timelines, damage client relationships, and increase costs.
  • Budget Overruns: Unexpected costs from poor planning or inefficient resource allocation, coupled with the increased fluctuation of material costs, can lead to budget overruns. This can hurt the bottom line and put a project in the red.
  • Workplace Safety: Accidents can cause significant delays or even lead to legal troubles. Maintaining high safety standards is a crucial challenge for the construction industry.
  • Communication Gaps: If project details or job site issues are not communicated promptly, miscommunication between teams, contractors, and other stakeholders can lead to costly errors.
  • Regulatory Compliance: Staying current with local, state, and federal regulations can be time-consuming and difficult. Furthermore, non-compliance can lead to cost penalties and a loss of clients’ confidence.
  • Document Control: Tracking estimates, change orders, project plans, or other documents can be overwhelming for small and large projects, especially for contractors still using paper methods.
  • Skilled Labor Shortage: With an ever-shrinking population of skilled labor, construction companies must maximize the productivity of their existing workers.
  • Resource Management: Poor equipment, labor, and materials allocation can lead to slow project progress, increased costs, and dissatisfied customers.

Core Features

Construction project planning software includes these key capabilities:

  • Bid Management: Simplifies creating bid packages, tracking bids, and generating professional proposals or estimates. Bid management tools can help automate routine tasks and organize bid packages.

  • Change Order Management: Automates creating, tracking, and approving change orders, preventing delays and ensuring transparency. It also ensures that all stakeholders and clients are informed of any project changes.

  • Daily Field Reports: Allows teams to input daily hours, job photos, and project updates from the site to ensure everyone is on the same page.

  • Subcontractor management: Helps schedule subcontractors, track performance, manage communication, and ensure subcontractors are insured and compliant.

  • Quality and Safety Compliance: Manages and schedules safety inspections, stores compliance documentation, and tracks incident reports. It automates the process of on-site reports and helps reduce the risk of accidents.

  • Client Communication: Improves transparency with client portals to update project progress, schedules, and documentation. This can also ensure clients approve and sign off on all change orders, further building trust.

  • Job Costing: Tracks and categorizes project costs into labor, material, or equipment. This can be further broken down by individual jobs, suppliers, or any other granular report that helps understand the outflow of costs.

  • Construction Scheduling: Provides a real-time view of ongoing project timelines. Helps predict where projects could get bottlenecked and provides notifications or alerts when key tasks are due or completed.

Based on a recent technology survey by Software Connect, here are some of the top trends for buyers looking to purchase construction software:

80% of all companies looking for software rely on manual methods to carry out basic business functions. If you struggle to make Excel spreadsheets or even pen/paper methods work, it may be time to get up to speed.

Over 70% of contractors are looking for job costing and project tracking functionalities, with about 67% of respondents also requiring estimating capabilities. While this does not dictate what your business needs, it does provide some guidance on what other companies are doing.

56% of construction businesses are currently not using construction management software. With that number growing yearly, it’s important not to be left behind.

Pie chart showing the usage of software in construction

What’s Best for My Construction Company?

Choosing the right construction software will depend on the type of projects you work on. This table matches recommended platforms with the type of construction services offered to help you identify the best solution for your company.

Contractor Type Recommended Systems Key Features Type of Projects
Residential Construction JobTread, Buildertrend, Houzz Pro Scheduling management, client portals, 3D floor plans Single-family homes, residential renovations
General Contractors Procore, Jonas Premier, Contractor Foreman Bid management, client portals, collaboration tools Office buildings, shopping malls, hotels
Home Builders Buildertrend, Procore, CHS Scheduling management, budget tracking, 3D floor plans Custom homes, residential complexes
Specialty Trade Contractors Projul, Contractor Foreman, Procore Crew scheduling, job costing, daily field reports Plumbing, electrical, HVAC installations
Renovation and Remodeling Contractors Houzz Pro, Buildertrend, Projul 3D floor plans, selections, client communication Home remodels, interior renovations
Commercial Contractors Procore, 123worx Collaboration tools for subs, project management High-rise buildings, industrial parks, retail buildings
Civil Contractors HCSS HeavyJob, InEight Daily job/equipment tracking, environmental impact Highways, bridges, large-scale infrastructure

Still not sure what’s best? Talk to one of our software advisors for free customized help.

Pricing

One of the key factors when looking into construction management software is its pricing. These software platforms vary heavily based on which features are included, the number of users, or even the amount and size of projects you work on at one time.

For example, Contractor Foreman starts at $49/month for one user and includes 35 basic features. Alternatively, another popular system, Procore , starts at $375/month for small-volume builders. Larger contractors typically charge based on the organization’s ACV.

  • Entry-Level Solutions: Range from $5,000-$15,000 per year

  • Mid-Market Software: Range from $15,000 to $50,000 per year

  • High-End Systems: Range from $50,000 to $150,000 per year

  • Enterprise-Level Software: Over $150,000 per year

  • Software as a Service (SaaS): Cloud construction software offers pricing as a monthly or annual subscription that you pay over time. Cloud system subscriptions can start at around $25/user/month and can increase to well over $1,500/month for larger contractors. Additionally, setup and training fees can cost between $500 to $20,000 depending on the complexity or customization required to implement.

  • On-Premise Software: Also known as locally installed software, on-premise software generally requires a significant initial investment to get started. These solutions tend to start at around $10,000 to $50,000. This investment will cover licensing fees, setup fees, and training costs. On-premise solutions are typically only for contractors with an established IT infrastructure or those comfortable paying for ongoing support ranging from $1,000 to $20,000 annually.

Understanding what other small and medium contractors spend on software might help you determine your own budget. Over the past few years, we surveyed hundreds of construction companies across all industries. Our findings showed that most companies spend about 1-2% of their annual revenue on software expenses, as referenced in the graph below.

To calculate your software spending, multiply your annual revenue by .015 to get a rough idea of what you should expect to spend.

Trial Periods and Free Plans

Some solutions offer trial periods or a free plan, enabling you to test the software before purchasing. Out of our product picks, Contractor Foreman, Houzz Pro, and JobPlanner offer free 30-day trials.

Construction Pricing Survey Results
43% of contractors spend 1-2% of their annual revenue on software tools

Frequently Asked Questions

+

What are the key features I should look for in construction management software?

 
Construction management software includes project scheduling, budget tracking, document management, collaboration tools, and mobile field reports as core features.
+

How do I choose the right construction management software for my business?

 

Choosing the correct software will depend on your project size, type of construction (residential, commercial, civil), specific features, and budget.

We can help provide suggestions for your construction business. Talk to one of our free advisors

+

What are the typical implementation timelines for construction management software?

 
Depending on the complexity and scale of the software you select, implementation can take anywhere from a few hours to several weeks. Most programs can be set up somewhat quickly unless additional customization is required.
+

Does construction management software scale as we grow our business?

 

Many construction management platforms offer scalability, allowing you to add users and features and your company or project expands. However, some programs are truly made for smaller contractors while other systems are specifically for larger well established firms.

We can recommend systems that best suit your business for today and plan ahead for tomorrow.

Talk with a software advisor
Talk with an advisor
Get a free consultation from an independent software expert.
Or, call toll-free: (800) 827-1151
Talk with a software advisor
Talk with an advisor