8.3
Editor’s Rating:
Best Overall
Oracle NetSuite: Home Screen
Oracle NetSuite
  • Hundreds of third-party add-ons available
  • Feature sets for multiple industries
  • Highly customizable
8.3
Editor’s Rating:
Best for Small Businesses
Dynamics 365 Business Central: Dashboard
Dynamics 365 Business Central
  • Combine ERP and CRM
  • Heavily customizable
  • Similar interface to Microsoft Word and Outlook
7.8
Editor’s Rating:
Best Mid-Market Option
Acumatica: Data Analysis Receivables
Acumatica
  • Made for small to mid-market businesses
  • Multiple editions
  • Open architecture for rapid integrations

To help you choose the right solution for your business, we found and ranked the best ERP systems today using our advanced review methodology.

NetSuite - Best Overall

Why We Chose It: NetSuite stands out as the best ERP due to its scalability to add modules on at a later date and it’s cloud hosted nature. Designed with growing companies in mind, its modular approach allows users to begin with core financial functionalities like A/R, A/P, cash management, and project accounting. As businesses evolve, they can seamlessly integrate additional modules such as payroll, HR, CRM, and eCommerce.

This flexibility, combined with the option to host internally or via a Software as a Service (SaaS) framework, ensures that sales teams, field technicians, and production staff can access vital data wherever they are. This not only fosters enhanced communication but also caters to the diverse needs of various sectors and organizational sizes.

Read our full NetSuite review.

Best Overall:
Oracle NetSuite

Oracle NetSuite: Home Screen
Oracle NetSuite: Income Statement
Oracle NetSuite: Journal
Oracle NetSuite: Unrealized Exchange Rate Gains and Losses
Oracle NetSuite: Ecommerce Customer Statistics
Oracle NetSuite: Sales Orders
Oracle NetSuite: Revenue Recognition
What We Like
Industry-specific editions
Customizable reporting
Automatic updates
What We Don’t Like
Complex onboarding process
Cost may be prohibitive to small businesses
Pricing requires consultation
Overview
Price Range: $$$$
Starting Price: $99/user/month
Client OS: Web
Deployment: Cloud Hosted

2 Dynamics 365 Business Central - Best for Small Businesses

Why We Chose It: Microsoft Dynamics 365 Business Central is a standout ERP solution tailored specifically for small to mid-sized businesses. The user-friendly interface is designed with familiarity in mind, especially for those already using Microsoft tools like Office 365. This ensures a reduced learning curve and quicker adoption.

Its accounting module is another highlight, offering detailed audit trails that ensure transparency in financial transactions. This is further complemented by multi-currency and multi-language support, catering to growing businesses with international aspirations. The software’s automation capabilities, particularly in invoicing and reporting, are not just about efficiency but also about accuracy, ensuring businesses maintain impeccable financial records.

Read our full Dynamics 365 review.

Best for Small Businesses:
Microsoft Dynamics 365

Microsoft Dynamics 365: Dashboard
Microsoft Dynamics 365: Items Viewing List
Microsoft Dynamics 365: Orders Viewing
Microsoft Dynamics 365: General Leger Entries
Microsoft Dynamics 365: Dashboard
Microsoft Dynamics 365: Customer Management
What We Like
User-friendly interface
Powerful accounting functionalities
Integrates with Microsoft Office
What We Don’t Like
Not ideal for complex manufacturing needs
May require extensive training
No free version
Overview
Price Range: $$$
Starting Price: $70/user/month
Client OS: Web
Deployment: Cloud or On-Premises

3 Acumatica - Best Mid-Market Option

Why We Chose It: Acumatica is a top ERP solution for mid-market businesses, primarily due to its modular architecture and industry-specific versions. This design allows businesses to handpick and license only the functionalities they currently need, ensuring they aren’t overwhelmed or overcharged. As these businesses grow and their needs evolve, Acumatica’s scalability comes into play, allowing them to seamlessly integrate additional modules.

The industry-specific editions allow companies in sectors like construction or manufacturing get tools tailored to their unique challenges and workflows. This precision ensures that businesses can optimize their operations without unnecessary workarounds. Furthermore, being cloud-based, Acumatica guarantees data security and offers both public and private hosting options, giving businesses the flexibility to choose based on their data handling preferences. This makes Acumatica a tailored, scalable, and secure choice for the established mid-market business.

Read our full Acumatica review.

Best Mid-Market Option:
Acumatica Cloud ERP

Acumatica Cloud ERP: Data Analysis Receivables
Acumatica Cloud ERP: Support Manager Dashboard
Acumatica Cloud ERP: Project Dashboard
Acumatica Cloud ERP: Staff Appointments on Map
Acumatica Cloud ERP: Field Services Tech Dashboard
Acumatica Cloud ERP: Production Manager Dashboard
Acumatica Cloud ERP: Warehouse Manager Mobile Dashboard
Acumatica Cloud ERP: Controller Dashboard
What We Like
Industry-specific editions
Multi-warehouse inventory management
Powerful integrations
What We Don’t Like
Complex learning curve
Higher cost compared to other ERPs
Requires a consultation call for pricing
Overview
Price Range: $$$$
Starting Price: $1,800/month
Client OS: iOS, Android, Web
Deployment: Cloud or On-Premises

4 Odoo - Best Open Source

Why We Chose It: Open source ERP software such as Odoo allows access to the source code, which provides new opportunities for customization and lets end-users have more impact on product development. This leads to transparency that elevates quality standards. Odoo can be a completely free ERP software, if you install and manage the software yourself. Otherwise, Odoo offers online hosting and several paid applications.

A standout feature we appreciate is its accounting module. Odoo’s accounting module offers bank synchronization, which reduces manual entry errors, and its pre-configured tax reports based on fiscal localization ensure businesses remain compliant without the usual hassle.

Read our full Odoo review.

Best Open Source:
Odoo

Odoo: CRM Sales Pipeline
Odoo: BOM Overview
Odoo: Lot and Serial Numbers
Odoo: General Ledger
Odoo: Draft Customer Invoice
What We Like
Interconnected modules
Multi-currency and -company systems
IFRS-compliant
What We Don’t Like
Unintuitive interface
Requires technical expertise
Cluttered mobile app
Overview
Price Range: $$$
Starting Price: $31.10/user/month
Client OS: Web
Deployment: Cloud or On-Premises

5 Lightspeed Retail - Best for Retail

Why We Chose It: Lightspeed is our pick as the top retail ERP system, as it caters to a vast array of retail sectors. Its user-centric design ensures ease of use, while its robust security features, including EMV compatibility and PCI compliance, prioritize customer data protection.

One of Lightspeed’s standout features is its comprehensive inventory management, which not only tracks sales but also offers real-time reporting, ensuring businesses stay ahead of demand. For companies with a larger inventory dealing with several product categories, Lightspeed lets you get as broad or detailed as you would like. Lightspeed also allows for reserved inventory, that lets you sell products that will remain on-site until a later date (for shipping or customer pick-up).

Best for Retail:
Lightspeed Retail

Lightspeed Retail: Import Inventory Items
Lightspeed Retail: Create Discount
Lightspeed Retail: Add Inventory Item
What We Like
Built-in SEO tools for online stores
Fully integrated inventory management
Automated purchase order creation
What We Don’t Like
Customers cant redeem gift cards online
Lack of different register modes
Limited integrated payments
Overview
Price Range: $$$
Starting Price: $69/month
Client OS: Windows, macOS, Web
Deployment: Cloud or On-Premises

6 Epicor Kinetic - Best for Manufacturers

Why We Chose It: Epicor Kinetic is our top manufacturing ERP due to discrete manufacturing capabilities. It’s tailored to handle unique, non-repetitive manufacturing processes, ensuring each product is made to specific customer requirements. Its robust product configuration stands out, allowing businesses to define and manage a multitude of product variations with ease. This is crucial for manufacturers who need to cater to diverse customer needs without compromising on efficiency.

Additionally, the low-code customization options allow businesses to mold the platform to their specific workflows, as opposed to rigid, one-size-fits-all software. This adaptability ensures that the ERP system grows and evolves with the business, rather than becoming a hindrance.

Read our full Epicor Kinetic review.

Best for Manufacturers:
Epicor Kinetic

Epicor Kinetic: Dashboard
Epicor Kinetic: Accounts Receivable
Epicor Kinetic: Shop Load
Epicor Kinetic: Purchase Order
Epicor Kinetic: Supplier Relationship Management
Epicor Kinetic: Shop Floor Interface (MES)
Epicor Kinetic: Kanban Warehouse Monitor
Epicor Kinetic: Job Scheduling Board
Epicor Kinetic: CRM Flight Control
What We Like
Powerful customizations
Robust product configurator
Great for discrete manufacturing
What We Don’t Like
Not ideal for multinational organizations
High learning curve
Limited CRM and HR modules
Overview
Price Range: $$$$
Starting Price: $175/user/month
Client OS: Windows, macOS, iOS, Android, Web
Deployment: Cloud or On-Premises

SAP Business One SYSPRO Sage 300/Intacct/Business Cloud ERP TallyPrime Cougar Mountain Denali Summit JD Edwards EnterpriseOne Deltek Costpoint QT9

7 SAP Business One - Best for SMBs

Why We Chose It: SAP Business One is an ERP suitable for small and medium-sized companies looking to streamline their operations. The system’s administrative and system-level features, such as multi-currency/multi-language support, notifications, role-based permissions, and data migration capabilities, set it apart in the SMB ERP market.

SAP Business One also stands out for its scalability, ensuring that growing organizations can easily adapt to increased data, transactional, and user demands without major disruptions. And this software caters to a wide range of industries and company sizes, making it a versatile and accessible choice for businesses seeking efficient and scalable ERP solutions.


SAP Business One: Sales Analysis
SAP Business One: Enterprise Search
SAP Business One: Cash Flow
What We Like
Highly customizable
Improved decision-making capabilities via extensive BI
Multi-currency/multi-language support
What We Don’t Like
Requires phone consult for pricing
Setup usually requires help from a Value Added Reseller (VAR)
No payroll module
Overview
Price Range: $$$$
Starting Price: $410/user/year
Client OS: Windows
Deployment: Cloud or On-Premises

8 SYSPRO - Best for Discrete Manufacturing

Why We Chose It: SYSPRO is a manufacturing ERP which supports various manufacturing modes including engineer-to-order, make-to-stock, and mixed-mode operations.

The integration of AI and IoT technologies is a valuable feature, enhancing decision-making and operational efficiency. And the option for hybrid on-premises and cloud deployment adds further flexibility to accommodate a variety of business preferences and regulations. However, users should be aware of the need for third-party add-ons for payroll and HR modules.


SYSPRO: Home Menu
SYSPRO: AP Invoice Posting
SYSPRO: Warehouse Maintenance
SYSPRO: Dimension Analysis
What We Like
Mostly straight-forward and user-friendly
Built with over 40 years of manufacturer and distributor expertise
Integration with AI, MI, IoT, and Cloud-hosting
What We Don’t Like
3rd party add-ons may be necessary, like EDI and shipping notifications
Difficult to customize
No payroll or HR modules
Overview
Price Range: $$$$
Starting Price: $199/user/month
Client OS: Windows, Web
Deployment: Cloud or On-Premises

9 Sage Intacct

Why We Chose It: Sage Intacct provides a solid foundation for financial management while ensuring GAAP compliance. The software’s flexibility extends to tax management with Avalara integration, making tax calculations, reporting, filing, and auditing accurate and efficient. The endorsement by the AICPA adds credibility to its financial management capabilities.

What makes Sage Intacct particularly attractive is its scalability, making it suitable for small to mid-sized businesses with annual revenues between $5 million and $250 million. Its multi-entity support, project accounting, and multi-dimensional reporting capabilities are noteworthy, allowing businesses to adapt and grow as needed.


Sage Intacct: Purchasing
Sage Intacct: Entities
Sage Intacct: Order Entry
Sage Intacct: Resource Search
Sage Intacct: Report Center
Sage Intacct: Financial Report Editor
Sage Intacct: Dashboard
What We Like
Multi-dimensional reporting capabilities
Scalability for multi-entity support and user growth
Simple and responsive user interface
What We Don’t Like
Budgeting and interactive reporting cost extra
Limited non-financial functionalities
Volume exports can be difficult
Overview
Price Range: $$$
Starting Price: $8,580/year
Client OS: Web
Deployment: Cloud Hosted

10 TallyPrime

Why We Chose It: TallyPrime is an ERP software solution particularly known for its user-friendly approach and versatility. A range of features includes invoicing, accounting, payroll management, inventory management, business reporting, and more.

One notable feature of TallyPrime is its flexibility, as it can be easily customized with integrations and extensions, ensuring that it can adapt to the unique needs of different businesses. Its compatibility with various devices and web browsers allows for convenient access from anywhere, enhancing the software’s usability and accessibility.


TallyPrime: Pending Exports
What We Like
Comprehensive GST Support
Multi-Company Support
Check Printing Features
What We Don’t Like
Limited Invoice Formats
Runs Slower With Large Datasets
No Automatic Backup
Overview
Price Range: $$
Starting Price: $27/month
Deployment: Cloud or On-Premises

Our Methodology for Choosing ERP Software

At Software Connect, we personally review software using an in-depth methodology we use when evaluating ERP software. However, in many cases, the following criteria tend to be the most important:

1 Key Features

ERP software should effectively meet your organization’s core business requirements. Assess whether the software offers the necessary modules and integrations to support your specific processes and workflows. The availability of essential features in the base program can significantly impact the software’s suitability and total cost of ownership.

2 Usability and Performance

The usability of the software is another top consideration we have. A user-friendly interface and intuitive navigation can significantly enhance user adoption and productivity. We know if the software is overly complex and requires extensive training to master, it can lead to inefficiencies and increased support costs. So we look to see if the software’s layout and functionality align with an average users’ skills.

We also compare how usable the software is to how well it performs. Some simple interfaces increase usability but at the cost of the ERP’s performance. We check to make sure the two are well-balanced.

3 Scalability

The last main criteria we use for evaluation is scalability, or the ability of software to evolve and grow with your business needs. We assess how easily an ERP software can accommodate changes, such as adding new users, locations, or features. We consider both the time and cost implications of scaling the software to meet your future needs when looking for ERP systems which can adapt to growth without process disruptions or expenses.

What is ERP Software?

ERP software is an integrated suite of business applications designed to automate or help with back-office functions of your organization, including end-to-end business processes such as financials, sales, and operations. More commonly, they can be thought of as all-in-one software for a business, covering a variety of processes.

ERP systems include a broad variety of modules chosen to meet the specific needs of your business. These features connect all areas of your business to create maximum efficiency. By enabling inter-departmental collaboration, ERP software provides a means for better financial tracking and forecasting. Comprehensive analytics use in-depth insights and real-time data to better inform your business decisions.

Read More: What is ERP? A Comprehensive Guide

SAP Business One Cash Flow Forecast ERP Software
A cash flow forecast in SAP Business One, which also shows the available modules on the left-hand side.

ERP Modules

To discover which ERP modules are relevant to your specific needs, you’ll need to know what features you’ll need to implement and how you can implement them effectively to streamline business management.

  • Accounting: Tracks revenues and expenses. Includes modules such as accounts payable, procurement, accounts receivable, a general ledger, and payroll for employee compensation.
  • Budgeting and forecasting: Creates and manages detailed corporate financial plans, which estimate a company’s future revenues and expenses. Includes departmentalized budgeting, budget approvals, rolling budgets, predictive budgeting, dashboards, and workforce planning.
  • Customer Relationship Management (CRM): Support sales, marketing, and service activities with contact management, conversation history, lead tracking, order histories, quote/invoice creation, and call center integration.
  • Human resources (HR): Provides human capital management of current employees and aids in the hiring and onboarding process for new employees. Includes features such as application processing onboarding, time and attendance tracking, and benefits management.
  • Inventory Management: Tracks all information about the items that your company builds, buys, stores, or sells.
  • Supply Chain Management: Manage the flow of goods and services between locations as efficiently and as cost-effectively as possible
Quoting and Sales Order Processing Sage X3 ERP Software
The quoting and sales order processing dashboard in Sage X3 allows managers to see sales data and figures by rep and by customer.

Benefits of ERP Software

Why is a centralized, comprehensive ERP software solution necessary in the modern business environment? What is the business value of cloud-based ERP? Some of the top benefits of ERP that businesses and departments alike have experienced via improved workflows, streamlined business functions, and significant savings:

  • Streamlined workflows and processes. Disconnected systems are inherently inefficient. Data may exist in multiple places at once and there is a time cost paid every time data is transferred between them. By providing a common interface and database, data is managed singularly, allowing much more efficient processes.
  • Visibility into workflows. ERP can speed up internal processes and also provide the mechanism to monitor them for continuous improvement. Transparency is a central goal to effectively deploy ERP systems. ERP allows organizations to consider processes from a more holistic standpoint to spot issues preventing optimization.
  • Better financial planning and decision-making. Reporting is key to ERP solutions. The ability to slice and dice data by region, location, profit center, employee, and in a variety of other ways allows decision-makers to make more nuanced and accurate decisions about the financial direction of the business.
  • Improved data security. Managing security permissions and access across a variety of systems is a daunting challenge. A common control system allows organizations the ability to ensure key company data is not compromised.
  • Increased opportunities for collaboration. Data takes different forms in the modern enterprise. Documents, files, forms, audio and video, emails. Oftentimes each data medium has its mechanism for allowing collaboration. That’s inherently wasteful. Employees are more effective when they spend more time collaborating on content, rather than mastering the learning curve of communicating in different formats and across distributed systems.
SYSPRO Production Schedule ERP Software
Create production schedules in SYSPRO.

Industry-Specific ERP Software

ERP modules are available for virtually every task, program, or function that a business performs. There are even specific products to handle small business ERP while others are aimed at enterprise-level corporations.

ERP solutions include modules that help with all facets of a business, but should be prioritized based on what industry your business falls under:

  • Construction businesses: Contractors need to focus heavily on the task at hand and spend less time worrying about their back-office procedures. Construction ERP software provides financial accounting and operational modules designed specifically with contractors in mind. Core functionalities include accounting, job costing, project management, and estimating.
  • Manufacturing: MRP systems, provide the necessary tools for your manufacturing company. This includes material resource planning, quality management, and inventory control.
  • Supply chain management: Those who deal with wholesale and distribution trade need to improve the efficiency of their logistics. This includes improved order management, purchase orders for needed goods, inventory control and/or warehouse management for efficient stock control and pick/pack improvements, and tracking deliveries.

Is QuickBooks an ERP?

While not an ERP software in the traditional sense, QuickBooks Enterprise brands itself as an “ERP alternative”. QuickBooks Enterprise attempts to let smaller businesses get ERP-level functionality at a small business software price and offers an easy transition from their more simple options (Pro, Premier, or Online) to a business that is suddenly in need of more advanced functionality.

The software can manage and integrate all components of their businesses such as marketing, accounting, sales, costing, manufacturing, and more. The software excels at offering advanced functionality of the modules you’ll find in its Pro and Premier versions, such as advanced inventory tracking, advanced pricing, and advanced reporting.

Read more: Is QuickBooks an ERP System?

QuickBooks Enterprise company snapshot
Advanced inventory capabilities in QuickBooks Enterprise.

When Should an ERP Be Replaced or Upgraded?

Technology is being upgraded and replaced at such a rapid pace, it can be hard for businesses to keep up. At the same time, it’s important not to fall victim to every new tech fad. When the time does come for an ERP platform upgrade or even to purchase a new solution, you may feel overwhelmed with the volume of options available.

Some important questions to ask yourself about your company include:

  • How do you currently handle financials, sales, and other business operations?
  • What new functionalities do you want most, either in a base software or as an add-on module?
  • Which deployment options will offer the greatest accessibility?

Questions to ask ERP vendors include:

  • Does your software include industry-specific modules or customization?
  • Do you offer on-premise ERP or cloud-based software? Is there a hybrid option?
  • How much training would need to be administered?
  • Does the software require additional hardware? Can it be accessed on mobile devices (smartphones, tablets)?
  • Is there a one-time perpetual license fee or are subscription payments required?

ERP which is software-as-a-service (SaaS) includes routine upgrades and maintenance as part of the ongoing subscription cost. While you may pay more for the software throughout ownership, you’ll have peace of mind knowing you have the latest ERP applications at all times.

Read more: Deciding When to Replace or Upgrade Your ERP Software

What Business Problems are Solved by ERP Software?

Some of the most common problems that ERP software can solve include replacing legacy systems, managing large levels of customization, and integrating with other systems.

Replacing legacy systems

If you’re searching for a new ERP software system, it’s likely because what your company runs now is outdated. Older systems were coded in different languages and the software may no longer be supported by the original developer. The solution may have also been developed in-house by an employee who is no longer with the company. Maintaining support on this type of system is costly and exhausting.

Read more: The Challenges of Legacy ERP vs. Modern ERP

Daunting levels of customization

When ERP solutions first became a thing, heavy customization was a must to ensure the solution did what you want. This meant developers and vendors spent a lot of time writing custom customization code for your company, which was expensive. On top of that, any updates to the systems would require maintenance of the custom code.

Over time, ERP systems have begun to offer standard modules that most have some use for. Nowadays, customization is limited to creating modules that will help you go above and beyond your competitors.

Read more: ERP Customization: Risk Mitigation and Best Practices

Integration issues with other systems.

Even under the best of circumstances, ERP integration can spiral in an unforeseen direction. Besides customization, one of the biggest headaches of an ERP implementation is getting it to work with existing systems.

ERP vendors may push for their solution to be the one and only system being used at your organization. That’s not always possible. Before making the substantial investment in an ERP solution, decide what integrations are needed, if any, and make sure your business has the appropriate budget to cover what your staff wants or needs.

ERP Software Pricing

The cost of ERP monthly subscriptions ranges from $1,700 to $10,000 for small to midsize businesses. Most ERP vendors estimate software should cost about 3% of annual sales.

ERP pricing depends on a lot of variables, such as number of active users, total employees, and whether the system is on-premise or cloud-based. Monthly subscription costs can range from

Implementation costs are another key variable, as they can drastically increase the total cost of ownership (TCO) during the first year of use. The general rule of thumb is to calculate implementation fees is to double the cost of using the software annually.

While interest in cloud technology is growing overall, large companies still have a distrust towards cloud hosting. Our recent buyer trends survey found that companies with 50+ employees shopping for accounting software were 41% less likely than smaller companies to review cloud-hosted software. Hybrid ERP is also an option to consider.

Read More: On-Premises ERP Software vs. Cloud-based ERP Solutions

ERP Software Trend: Artificial intelligence in ERP

A report from Nextec Group suggests that artificial intelligence can help advance ERP capabilities in years to come. This is by providing enhanced customer service through:

  • AI-generated answers
  • Mining data during an interaction with a customer for further evaluation
  • Analyzing the way users access and interact with the systems to create automated actions
  • Using virtual reality tools in the field to let other employees interact and provide insights

ERP Software Trend: Increased focus on business intelligence

Business intelligence systems are becoming more of a necessity for businesses of all sizes. Large enterprises are not the sole beneficiaries of the type of reporting and data that can be gathered from a valuable BI system. Our buyer trends survey also found that companies with over 50+ employees were 70% more likely to need software that handles budgeting, business intelligence, and fixed asset management.

Top ERP vendors will need to either invest heavily in providing a business intelligence module or look to integrate with some of the top options on the market.

All Products

No products found
NetSuite ERP Screenshot

NetSuite ERP

★★★★★
★★★★★
(26)
Oracle’s NetSuite is well-known in the ERP world for its customization and scalability. It’s a multi-tenant ERP software supporting finance, operations, sales, service, and HR needs.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$99/user/month
Client OS
Web
Deployment
Cloud Hosted
Acumatica Cloud ERP Screenshot

Acumatica Cloud ERP

★★★★★
★★★★★
(24)
Acumatica is a renowned platform in the ERP world. It offers accounting, distribution management, CRM, manufacturing, and more modules. Acumatica supports unlimited users, with pricing based on the resources and modules your company uses.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$1,800/month
Client OS
iOS, Android, Web
Deployment
Cloud or On-Premises
Dynamics 365 Business Central Screenshot

Dynamics 365 Business Central

★★★★★
★★★★★
(11)
Microsoft Dynamics 365 Business Central provides finance, human resources, operations, marketing, sales, and more functionalities. It is a part of Microsoft’s suite of enterprise applications and integrates seamlessly with services like Office 365, Power BI, and Azure.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$70/user/month
Client OS
Web
Deployment
Cloud or On-Premises
Sage Intacct Screenshot

Sage Intacct

★★★★★
★★★★★
(46)
Sage Intacct is a browser-based, GAAP-compliant financial management software system. It features multi-entity financial reporting, customizable reports, and a user-friendly interface. The AICPA has endorsed the platform as a “preferred provider of financial management application.”
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$8,580/year
Client OS
Web
Deployment
Cloud Hosted
Odoo Screenshot

Odoo

★★★★★
★★★★★
(21)
Odoo is an open-source ERP software that integrates CRM, manufacturing, eCommerce, and more. Odoo’s accounting module offers functionality in accounts payables and receivables, bank synchronization, and reporting. You can extend the accounting app’s functionality with the tax report module.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$31.10/user/month
Client OS
Web
Deployment
Cloud or On-Premises
Lightspeed Retail Screenshot

Lightspeed Retail

★★★★★
★★★★★
(1)
Lightspeed Retail is a cloud-based point-of-sale (POS) system designed for retailers, especially those with multiple locations. It offers inventory management capabilities allows users to import product catalogs, categorize items, and manage stock across multiple locations. Additionally, its customer relationship management (CRM) features help build detailed customer profiles and manage loyalty programs effectively. Employee management features like time tracking and performance logs add to operational efficiency. Some parts of Lightspeed Retail are made from the acquired Vend POS. The software integrates with popular accounting tools like QuickBooks and Xero.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$69/month
Client OS
Windows, macOS, Web
Deployment
Cloud or On-Premises
SAP Business One Screenshot

SAP Business One

★★★★★
★★★★★
(12)
SAP Business One provides comprehensive business management capabilities for small and medium-sized companies. This system provides integrated departmental support for finance, sales, supply chain management, production, project management, and production processes. This software can be deployed on-premise or on the cloud, and accessed from any mobile device through iOS and Android apps. The SAP API Business Hub allows for a wide range of partner integrations.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$410/user/year
Client OS
Windows
Deployment
Cloud or On-Premises
Epicor Kinetic Screenshot

Epicor Kinetic

★★★★★
★★★★★
(9)
Formerly known as Epicor ERP, Kinetic is renowned in manufacturing and distribution. Kinetic is a two-tier ERP software offering compliance management, planning and scheduling, supply chain management, quality assurance, and maintenance management.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$175/user/month
Client OS
Windows, macOS, iOS, Android, Web
Deployment
Cloud or On-Premises
SYSPRO Screenshot

SYSPRO

★★★★★
★★★★★
(15)
SYSPRO is a major developer in the ERP world. Since 1978, it’s built a solid reputation in the manufacturing and distribution sectors. SYSPRO is an ERP software designed for discrete manufacturing and mixed-mode operations.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$199/user/month
Client OS
Windows, Web
Deployment
Cloud or On-Premises
TallyPrime Screenshot
TallyPrime is a business management software designed for companies prioritizing growth, efficient cash flow, and enhanced efficiency. It offers features like customizable reports, quick bill management, intuitive workflow, and a flexible inventory system with multi-currency support.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$27/month
Deployment
Cloud or On-Premises
Oracle ERP Cloud Screenshot

Oracle ERP Cloud

★★★★★
★★★★★
(4)
Oracle ERP Cloud is a cloud-based, comprehensive ERP suite offering advanced capabilities like AI automation, real-time analytics, and regular updates. It covers various business functions including financial, project, and supply chain management. This software is designed for businesses looking to streamline operations, enhance efficiency, and reduce IT costs.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$175/user/month
Client OS
Web
Deployment
Cloud Hosted
Priority ERP Screenshot

Priority ERP

★★★★★
★★★★★
(1)
Priority ERP is a cloud-based business management and ERP software. It stands out due to its broad range of functionalities, covering areas like finance, customer service, logistics, manufacturing, WMS and more. It is designed to cater to businesses of various sizes, from mid to large enterprises, and is especially well-suited for industries like manufacturing, distribution and retail.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$100/user/month
Client OS
Web
Deployment
Cloud Hosted
Multiview Screenshot

Multiview

★★★★★
★★★★★
(3)
Multiview is an ERP software designed to enhance financial operations. Its key features include advanced financial consolidation, customizable reporting, and integrated budgeting and forecasting. Multiview offers customizable dashboards, data export to Excel, and advanced drill-down capabilities to enhance audit efficiency and data transparency.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Client OS
Windows
Deployment
Cloud or On-Premises
Dynamics 365 Finance and Operations Screenshot
Microsoft Dynamics 365 Finance and Operations is an ERP software providing global financial management. The platform integrates AI to streamline financial processes and accommodates multiple currencies and legal entities. Key features include comprehensive reporting, machine learning-driven insights, and role-specific workspaces to optimize financial planning, analysis, and control.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$180/user/month
Client OS
Windows, Web
Deployment
Cloud Hosted
Sage 300 Screenshot

Sage 300

★★★★★
★★★★★
(15)
Sage 300, previously known as ACCPAC, is an ERP software designed for small and medium-sized businesses. It offers financial and operational management, including accounts payable/receivable, general ledger, inventory control, project/job costing, and purchase order management. This ERP system supports multi-entity, multi-location, and multi-currency operations, making it suitable for global businesses. It also integrates with Sage Intelligence for reporting and BI tools. Sage 300’s strong VAR network means it has a variety of industry-specific add-ons and tailored support services.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$2,075/user (perpetual license)
Client OS
Windows, Web
Deployment
Cloud or On-Premises
Workday Screenshot

Workday

★★★★★
★★★★★
(4)
Workday is a web-based enterprise software that offers financial and human capital management solutions for various industries. The platform boasts unified finance and HR functionalities, bringing real-time insights and auditable process management via a modern SaaS model. Workday stands out for its integrations with over 600 third-party tools, in-depth people analytics, and AI-driven employee engagement and skills management. It features the Workday Peakon Employee Voice, an AI-based tool for employee engagement, and the Workday Skills Cloud for AI-based hiring and employee development. It also includes mobile apps for employee self-service, such as timekeeping and viewing benefits.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$45/employee/month
Client OS
Web
Deployment
Cloud Hosted
SAP Business ByDesign Screenshot

SAP Business ByDesign

★★★★★
★★★★★
(1)
SAP Business ByDesign is an ERP software with accounting tools, HR capabilities, and a CRM 360 view for managing customer relationships. Additionally, it provides project management tools for revenue and expense tracking on a project basis, procurement management to centralize supplier information, and supply chain support for real-time demand planning and production management.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$22/user/month
Client OS
Web
Deployment
Cloud Hosted
Accounting Seed Screenshot

Accounting Seed

★★★★★
★★★★★
(3)
Accounting Seed, a full accrual accounting app on Salesforce, offers real-time financial tracking throughout the business lifecycle, from marketing to financial statement production.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$250/month
Client OS
Web
Deployment
Cloud Hosted
Industry Software Screenshot

Industry Software

★★★★★
★★★★★
(13)
Industry Software is a business management suite. Its modular design offers specific solutions like ERP, CRM, Manufacturing Execution Systems (MES), and Quality Management Software (QMS). With features like CRM and advanced analytics, it supports scalable growth and operations across various sectors.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Client OS
Web
Deployment
Cloud Hosted
Sage 100 Screenshot

Sage 100

★★★★★
★★★★★
(20)
Sage 100 is an ERP software with financial management tools, advanced inventory management capabilities, and integration with other business systems. The insights and reporting tools, such as Crystal Reports and Sage Intelligence Reporting, help companies gain meaningful insights. Additionally, Sage 100 supports distribution and manufacturing processes to optimize warehouse operations and manufacturing productivity. Its customization and integration options, including Microsoft Office Link and Paperless Office, enhance the user experience and efficiency. Sage 100 was formerly Sage MAS 90 ERP and Sage MAS 200 ERP.
Price Range
   $     $     $     $     $   
   $     $     $     $     $   
Starting Price
$76/month
Client OS
Windows
Deployment
Cloud or On-Premises

We searched and searched, but we couldn’t find any products in our database that match your criteria. Perhaps our team of software experts can help? They’d be happy to provide a list of free recommendations that meet your exact requirements.

Sort by 
Filter by User Rating
Filter by Price Range
Filter by Deployment
Filter by Client OS
Talk with a software advisor
Talk with an advisor
Get a free consultation from an independent software expert.
Or, call toll-free: (800) 827-1151
Talk with a software advisor
Talk with an advisor